Laserfiche WebLink
6 <br />® retton <br />Tas_na ement Plan 7 <br />rB�_ <br />generated in the foregoing analyses <br />plan for use by <br />The recommendations g future <br />will be compiled in tstaf{rand fcoancilgin making <br />the Mounds View Citystaff893. Data and agency <br />decisions ence upon <br />51e will <br />provide <br />correspondence upon which :.•ich recommendations are fade will <br />endix to the Plan• watershed <br />Ci included the <br />an ape lens for preliminary review. <br />CiiT staff, the Minnesota DNR and the appropriaterovide the <br />district with draft management P we will P <br />the necessary revisions, art. <br />upon making 1n copies of the final rep <br />City with ten <br />Task 7. Pl sent�t1On <br />Present our findings and the <br />We will be available to p meeting <br />of the Mounds Vier: City Council. <br />final plan at one <br />Optional Future T_a9ks <br />We will be available upon completion to perform a <br />f� These <br />number of optional future tasks related to the <br />implementation of recommended management mese'ires. <br />tasks include: lications for <br />and drafting permit app d to be <br />1 Negotiating These permits are expectsMinnesota <br />dredging operations. Army Corpa of Sngineersrlroundwater <br />required from the 'U.S. <br />DNg and the api�I* able watershed �gliti�cimprovement measure, <br />ro riati0r permit may be necessary• <br />augmentation is used as a water <br />a DNR water app a oil disposal <br />y, Development of detailed dredging and sp <br />registered civill engonFiePaieafinnla <br />plans. we have several conceptual plan, <br />ro <br />bvide ccnstructlon <br />to our teat. to eoificationsref DIP. our <br />, and to p <br />plans and spservicea. <br />observation If the City elects to <br />water quality monitoring. quality <br />3, ongoing les, have <br />undertake periodic future measurement of water <br />parameters, we will be available to obtain same <br />them analyzed, and provide our interpretation as <br />to now the <br />results should affect ■anagem:nt decisions, <br />for <br />ment of detailed plans and specifications <br />buffer <br />;. Develop the adjacent upland <br />by s <br />landscaping the we margins <br />would be developed <br />and the spoil area' These P <br />registered landscape architect in concert with our wildlife <br />biologist. <br />