Laserfiche WebLink
0 <br />payment to the Contractor and the actual <br />State furnished materials costs. <br />b. Six (6) percent of each respective final <br />share (Item (a) above) for the cost of <br />Engineering and Inspection. <br />The amount of the funds advanced by the County and City <br />in excess of the County•s and Cit,y's final suare will be returned <br />to the County and City without interest and the County and City <br />agrees to pay to the State that amount of its final share which <br />is in excess of the amount of the funds advanced by the County <br />and City. <br />7. The County and the City shall jointly be <br />") responsible for the installation of an adequate electrical power <br />�e. <br />ktw <br />supply to the service pad or pole for System "A". The City shall <br />receive the bill for the installation of the electrical power <br />supply, and invoice the County for 50 percent of the cost. The <br />City shall provide necessary electric power for the operation of <br />the new traffic control signal installation, at the cost and <br />expense of the C?:y. The County shall provide necessary electric <br />power for the operation of the street lights, at the cost and <br />expense of the County. <br />S. Upon completion of the work contemplated in <br />Paragraph 3a (System "A") hereof, it shall be the County's <br />responsibility, at its cost and expense, to: (1) maintain the <br />luminairies; (2) relamp the new traffic control signal and street <br />65362 <br />-6- <br />F <br />