Laserfiche WebLink
-z- <br />There is some indication that the building may be shifted <br />40 feet to the west which would remove the building from <br />the 100 foot buffer. This is measured as the 100 foot <br />buffer from the wetland after filling and reconfiguration <br />as would be approved by the Council by granting a wetland <br />alteration permit. <br />At Monday night's meeting, Barr Engineering will give the Council <br />a verbal presentation on their wetland analysis of the proposal. <br />At that time the developer will be presenting a revised site plan <br />addressing comments obtained from previous meetings. <br />KH/BC <br />