My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1989/02/06
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1989
>
Agenda Packets - 1989/02/06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 4:15:08 PM
Creation date
4/15/2025 4:15:08 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
2/6/1989
Description
Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1990 CAPITAL IMPROVEMENT PROGRAM <br />REI+iEVER AIRPORTS <br />ST. PAUL DON NLAM ORT <br />BUILDING AAFA E) eA'c� 10 • S3000000 vith <br />he <br />WzY <br />The 25•aae elevated buildingarea ed to created <br />in conjunction <br />onj a tioned %zingt1989.wThis project <br />devaloprnent project is exp Tarawa A•3 <br />extend the building area another 1,100 feet to the southeast along Y <br />(approximately 15 acres) and include all nccssary excavation, fill material, sewer, water, <br />tru <br />paring, etc. required to make this space available for hangar consction. previously <br />approved by the Commission. <br />CFR BUILD_ IN AND EOUIPME If • $500.000 <br />y:'om over the past few Yeas's with the City of SL Paul <br />There have been a series of <br />regarding a joint use fire station at the airport that would provide additional services to the <br />acility <br />airport as well as the surrounding rorr.'nuniry. The Commission would Preciously approved by by tilt rommiss on. <br />and the city would man and operate the station. <br />Y,AC BUILDING MODMCAT101_S • 5600 000 <br />This category will provide for facility modifications rehabilitation to ensure continued <br />efficient operation of the buildings or modifications necessary to meet the requirement/ of <br />! the various tenants. Two major projects will be evalu.ted during1989. the the past st r tvon <br />eats <br />of the office annex on the WLIgs Hangar which has been uninhabitable <br />due a swctctio inadequacies and poter,f �' of insulation h reccttsdwill be thoroughly analyzed <br />the centre section of the Riverside Hangar tY• <br />and recommendations will be available when the CIP is updated for the :990 construction <br />season. <br />ggR77Y�NO • $100.000 <br />fencing pirport be <br />te <br />It i proposed the second phase uof a unauthorized, <br />saccess to airpoograin for the rt perational areas <br />to identify airport Property N <br />CRYSTA?.ARPORT <br />ELECTRIGSL MODIFICA-TIONS • 5750000 <br />The runway edge lights and imderground ccuitry for P.unway 5/23 have dctcriorated to <br />the extent that norrral maintenance camtot provide continued.s uninterrupted <br />will dreplace the <br />existing system u also <br />� a constant Current,voltage system, <br />lighting system. <br />le <br />ciurent L'ghting system <br />
The URL can be used to link to this page
Your browser does not support the video tag.