Laserfiche WebLink
QLiiohe=117 M51N;-N9VCF SUILDIN:• - 5250.000 <br />C=er,Jy, the equipment maintenance function for the west side reliever airports (Flying <br />Cloud, Crystal, and Anoka County -Blaine Airports) it conducted in a facility at Flying Cloud <br />Airport it has been suggested that the maintenance functions be relocated to Crystal <br />Airport and, therefore, be more centrally located to all airports. The facility at Flying Cloud <br />could be convened to equipment storage space which is required to accommodate the <br />eviihing equipment fleet. The potential benefits (reduced travel time, less equipment dowir- <br />nine, additional storage space, etc.) will be analyzed and a recommendation.. prepared when <br />the OP is updated for the 1990 construction season. <br />ANDKA COUNTW-BLT E AMPORT <br />PAVEMEN7 REHP.BILTTP.TION . a250.0D0 <br />Periodically, it is necessrs), to rehabilitate aircraft o, eradonal areas (nvrways, taxiways, <br />aprons) through bituminous overlays, sealcoats, or in some instances, reconstruction, to <br />restore the surfar:s to a smooth, even condition and improve overdl operating conditions. <br />A pavement condidon survey will be completed during 1989 to identify any rehabilitation <br />required and a project will be more specifically defined when the CIP is updated for the <br />1990 construction season. <br />SECURITY FENCING - S10D oon <br />It is proposed to continue with the phased program to provide perimeter fencing for the <br />airport to identify airport property and minimize unauthorized access to airport operational <br />areas. This year's project will address the east and south airpm i boundaries. <br />E� <br />LAM ELMO AMPORT <br />NORTH BUILDING AREA DEIrF.LOPMEN7 - 5250 000 <br />The ersting hangar construction areas at the airport are reaching capacity. It is proposed <br />an expznsion of the north building area b- etzluated. <br />SECUUN FENCING - S1D0 DOD <br />It is proposed a perimeter fencing prog atn be initiated for the airpor.' that will be <br />implemented rhro:igh % phased program over two yea=. to identity z_Pon property and <br />minimize unauthorized access to airport operational areas. The initial phase will concentrate <br />on the west building area and the west and south perimeters of the airport <br />90CIPRe1LAO <br />I <br />