Laserfiche WebLink
,Rvnv raFNT PROJET <br />1989 CAPRE�OLIEE�'JTr' <br />ST. PAUL DOWNTOWN AIRPORT <br />AIRPORT BEACON REp1ABILiTATION 50 000 r tatL airport beacon and <br />This project Provides for a thorou;h analysis of the eAsting <br />tower and refurbishment or replacement to comply -.,id, went FAA erircria Previously <br />approved by the commission. <br />..r"nft _ Sl At; 000 <br />LMNORT Stnvi�c ��r••-- . _ - airport to comply with FAA <br />In 1988, Bayfield Street was relocated at the entrance to the attP area was reconstructed <br />ro osed a rehabffitution/reconstru do the <br />criteria and the extension of o the <br />Street It is proposed <br />east side tration Building <br />to provide improved access to thee taziacf Bayfield from t1le Add in lra access road to the <br />accomplished on the remaining simar work be accomp administration <br />North Riverside Hangar o rov-des for the rehabilitation. of the the end <br />west hangar area- Thts item also P <br />buildinr parking lot which was constructed a and The pavement is approaching <br />of its d' i LFP and the surface is weathered and oxidised: normal maintenance activities <br />are no longer a viable option. <br />MAC BUILDING M Mlag 1gli 5150000 <br />"� provide for facility Modifications/rehabilitaotio <br />n <br />tohe� quircementseod <br />This category wr1 P cr modifications necessary year will involve the <br />efficient operation of the buildings coot item contemplated this y <br />the various tenants. The most signffi a administration building, and <br />replacement of the vehicular ramp leading to he basement on the east end of e <br />administration building, the removal of old scontrol tower <br />replacement of the roofing °n the air traffic <br />PAVEM� HABILtT:1TI0her- <br />DO <br />Periodically, it is necessary to ze. biLta-e aircraft operational areas (runways, tzuwa}s, <br />ous overlays, sealcoats, or in some instants, reconstruction.tions. <br />aprons) trrough bituminous even condition and improve overall operating <br />restore the surfaces to a smooth, <br />6. <br />This year's project will provide for the rehabilitation of Runwa}s 12/30 and 8/2 <br />Previously approved by the Commission. <br />PICKED *7 I&rETLAN D MITIGATION - 5560 000 <br />The de•.elopment of Runway <br />associated asdv°a7a and elevated building area at the <br />14/32, <br />airport resulted in the loss of We1landsced be the creation oloss of the rlrelatn note of new ed7and <br />wDare habitat +snits) was to be mitig Y <br />10 <br />3�� <br />