My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1989/02/06
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1989
>
Agenda Packets - 1989/02/06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 4:15:08 PM
Creation date
4/15/2025 4:15:08 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
2/6/1989
Description
Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
139
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 V.AJ% =KANCE POLIPME%7 BUILDING INTPROtEME'1TS - S5000_0 <br />A hangar Hdth an attached office area that was acquired by the Commission during the <br />initial Airlake acquisition process has been convened into the airport maintenance equipment <br />storage building. This project will provide for the replacement of the eAsting overhead <br />carave doors with more rm=s!v efficient units; the installation of a permanent, underground <br />fuel system and other miscellaneous improvements. Previously approved by the Commission. <br />PARTIAL PARALL°L TAYXAIAYS - S600 000 <br />T:us item consists of two major elements; a project to connect two existing taxiway segments <br />at the airport, resulting in a fulldength parallel taidway on the north ride of Runway 11/29 <br />and the construction of a partial taxiway on the south side of the runway to serve a view <br />hangar construction area. <br />PAVEMEN,r R`HABILITATIOIc - 576.0^0 <br />PeriodicaLy, it is necessary to rehabilitate aircraft operational areas (runways, tandways, <br />aprons) through bituminous overla}ls, sealcoats, or in some instances, reconstruction, to <br />restore the surfaces to a smooth, even condition and improve overall operating conditions. <br />This year's proect Kall include crack sealing and surface repai- to the runway followed by <br />a slurry sealcoat or thin biraminous overlay. <br />SOUTH BUILDING AREA DMLOPMENT - S600,000 <br />f..` The hangar corstniction area on the north side of the runway is full and a waiting list of <br />potential tenants is currently being maintained. It is proposed a phased development of the <br />hangar area south of the runway (recommended in the airport's long-term comprehensive <br />plan) be initiated <br />89RELCIP/AO <br />14 <br />i <br />di <br />
The URL can be used to link to this page
Your browser does not support the video tag.