Laserfiche WebLink
1 V.AJ% =KANCE POLIPME%7 BUILDING INTPROtEME'1TS - S5000_0 <br />A hangar Hdth an attached office area that was acquired by the Commission during the <br />initial Airlake acquisition process has been convened into the airport maintenance equipment <br />storage building. This project will provide for the replacement of the eAsting overhead <br />carave doors with more rm=s!v efficient units; the installation of a permanent, underground <br />fuel system and other miscellaneous improvements. Previously approved by the Commission. <br />PARTIAL PARALL°L TAYXAIAYS - S600 000 <br />T:us item consists of two major elements; a project to connect two existing taxiway segments <br />at the airport, resulting in a fulldength parallel taidway on the north ride of Runway 11/29 <br />and the construction of a partial taxiway on the south side of the runway to serve a view <br />hangar construction area. <br />PAVEMEN,r R`HABILITATIOIc - 576.0^0 <br />PeriodicaLy, it is necessary to rehabilitate aircraft operational areas (runways, tandways, <br />aprons) through bituminous overla}ls, sealcoats, or in some instances, reconstruction, to <br />restore the surfaces to a smooth, even condition and improve overall operating conditions. <br />This year's proect Kall include crack sealing and surface repai- to the runway followed by <br />a slurry sealcoat or thin biraminous overlay. <br />SOUTH BUILDING AREA DMLOPMENT - S600,000 <br />f..` The hangar corstniction area on the north side of the runway is full and a waiting list of <br />potential tenants is currently being maintained. It is proposed a phased development of the <br />hangar area south of the runway (recommended in the airport's long-term comprehensive <br />plan) be initiated <br />89RELCIP/AO <br />14 <br />i <br />di <br />