My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1989/06/05
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1989
>
Agenda Packets - 1989/06/05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 3:05:13 PM
Creation date
4/16/2025 3:05:13 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
6/5/1989
Description
Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1:ht the end of the (5) year lease period the customer will have <br />e option to purchase the tank for an additional $950.00 or <br />continue leasing at 525.00/mo. for the life of the contract. <br />DISPENSING SYSTEM <br />A new dispensing system will be provided. This will provide <br />improved filling efficiency. <br />CONCRETE PIERS <br />concrete piers will be provided to support the propane storage <br />tank(s). The concrete piers will conform to the shape of the <br />storage tank and will support the tank approximately four feet <br />above grade and approximately five feet below grade. <br />PIPING <br />All the ac sa: piping far both lim:id and vapor line,- and this <br />includes all schedule 80 pipe and forged steel fittings w4ll be <br />furnished. Piping will be provided from the transport unloading <br />station to the tank. <br />One lot of pipe supports required to support above ground piping <br />wherever necessary will be furnished. <br />RANSPORT UNLOADING STATION <br />One transport unloading station fabricated in accordance with the <br />latest NF?A Pamphlet 458 specifications for vapor return for <br />liquid fill lines will be provided. The unloading station will <br />consist of 2" indicating flow valve with back check, 2" strainer <br />and acme adapters with raincaps and chains. The vapor equalizer <br />line will consist of a 1-1/4" excess flow valve, 1-1/4" shutoff <br />valve and Acme hose adapters with raincaps and chains. <br />FIRE PREVENTION <br />(2) 20 lb. dry chemical fire extinguisher(s) will be provided <br />for the )ropane storage tank area, the transport unloading area <br />and other areas as required by NF?A pamphlet 458. <br />One lot of ":io Smoking" signs and "Special Instructions" signs <br />will be provided. <br />Cne lot c= - <br />_ _d" signs mounting on the propane <br />storage t_:k w"' a:so 'e ^rcvidec. <br />MA <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.