My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1989/06/05
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1989
>
Agenda Packets - 1989/06/05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 3:05:13 PM
Creation date
4/16/2025 3:05:13 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
6/5/1989
Description
Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PAINTING sandblasted and the entire <br />The tank will be completely <br />installation will be painted and color coded. The storage tank <br />will be primed and finished painted WHITE, All liquid lines <br />will be ORANGE and all high pressur indicated pas ltoetheLdirectioins wll beonnof <br />All Piping will be adequately <br />flow and to the contents of the pining. <br />ENGINEERING SERVICES, SHOP DRAWINGS AND DESCRIPTIVE DATA <br />our quoted price includes all of the necessary si?Prgndrawingsg <br />drawings such as plot plan, foundationpertinent drawing, <br />required for the <br />:Tiring diagrams and other The drawings are usually <br />installation of the equipment. <br />available in 2 to 4 weeks upon receipt of a formal purchase <br />order. <br />OPERATING INSTRUCTIONS <br />A booklet containing operating, installation, maintenance and <br />ecessry <br />start up instrueoandw a lcopyf of 1 FPA Pamphlet urnshed. All Oft458 nwill abe <br />drawings required <br />included. <br />At the time of start uP of the plant a training session will be <br />conducted to train all operating personnel on the sa-e operation <br />of the system. <br />START UP AND ADJUST`RIT <br />suburban Procane will furnish a field supervisor to supervise the <br />installation of the entire system and to provide start up and <br />installation has been completed. <br />adjustment after the <br />CRANE SERVICE <br />A crane will be provided to remove the propane storage tank from <br />the flatbed track and install it on the concrete Piers• This is <br />Lon that <br />location crane <br />flatbed truck a <br />n enter <br />on the he of eproposedstorage <br />the e o . <br />tank installation under their own power. <br />TESTING <br />All Pi.^.S will be ?•'essu_•e tes_e_ ?r.or to Putt_ 4 -=e spat=_ <br />PRICES IZTD T`-MS OF S? ' <br />^me.^.:'less Tan.<i <br />
The URL can be used to link to this page
Your browser does not support the video tag.