Laserfiche WebLink
PAINTING sandblasted and the entire <br />The tank will be completely <br />installation will be painted and color coded. The storage tank <br />will be primed and finished painted WHITE, All liquid lines <br />will be ORANGE and all high pressur indicated pas ltoetheLdirectioins wll beonnof <br />All Piping will be adequately <br />flow and to the contents of the pining. <br />ENGINEERING SERVICES, SHOP DRAWINGS AND DESCRIPTIVE DATA <br />our quoted price includes all of the necessary si?Prgndrawingsg <br />drawings such as plot plan, foundationpertinent drawing, <br />required for the <br />:Tiring diagrams and other The drawings are usually <br />installation of the equipment. <br />available in 2 to 4 weeks upon receipt of a formal purchase <br />order. <br />OPERATING INSTRUCTIONS <br />A booklet containing operating, installation, maintenance and <br />ecessry <br />start up instrueoandw a lcopyf of 1 FPA Pamphlet urnshed. All Oft458 nwill abe <br />drawings required <br />included. <br />At the time of start uP of the plant a training session will be <br />conducted to train all operating personnel on the sa-e operation <br />of the system. <br />START UP AND ADJUST`RIT <br />suburban Procane will furnish a field supervisor to supervise the <br />installation of the entire system and to provide start up and <br />installation has been completed. <br />adjustment after the <br />CRANE SERVICE <br />A crane will be provided to remove the propane storage tank from <br />the flatbed track and install it on the concrete Piers• This is <br />Lon that <br />location crane <br />flatbed truck a <br />n enter <br />on the he of eproposedstorage <br />the e o . <br />tank installation under their own power. <br />TESTING <br />All Pi.^.S will be ?•'essu_•e tes_e_ ?r.or to Putt_ 4 -=e spat=_ <br />PRICES IZTD T`-MS OF S? ' <br />^me.^.:'less Tan.<i <br />