My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1989/06/05
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1989
>
Agenda Packets - 1989/06/05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/16/2025 3:05:13 PM
Creation date
4/16/2025 3:05:13 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
6/5/1989
Description
Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
p Terms 25% with purchase order. <br />1 ; 30% upon delivery of <br />propane storage tank. <br />35% upon completion of the <br />installation. <br />in upon start up, but not <br />later than 30 days <br />after the installation <br />has been completed. <br />CONDITIONS <br />our proposal remains fi=m for a period of 30 days. <br />If our proposal is not accepted within 30 days, pricing of the - <br />propane storage tank and related equipment are subject to <br />escalation. <br />This quote innlucds oven .;`.cp i_n 'or rat -as only. if union Labor <br />Rates are to be used, this quote is invalid and new pricing must <br />be determined. <br />Driveways and landscaping are not figured into the above quoted <br />price. <br />If painting of the complete installation cannot be perfc-med at <br />the time of the installation due to weather conditions, the <br />rcustomer may elect to withhold from the final payment an amount <br />equal to the best quoted price by an acceptable local contractor. <br />We cannot be responsible for any shut down which may be incurred <br />due to the tying in of the propane system to the existing system. <br />The quoted price does not include any below ground obstructions <br />which may be encountered during excavation for the tank piers or <br />piping. These obstructions may include, but not be limited to; <br />ledge, foundation, boulders too large to be removed with <br />available equipment, etc. <br />The offer footings are based on 4000 2SF soil bearing. Any soil <br />conditions less than this, the piers will be constructed at an <br />additional cost. <br />During excavation any water problems that cannot be handled by <br />ordinary pumping methods will be billed to t^e customer at an <br />additional cost. <br />nC of used =an.ks 13 subjec: to a/a_laa--_ _ c_ =an CS in ou: <br />stJc:<. a : t e =_me oc acee?ta .ce J- '.a3 . - OCSa a '15Ed taC:.{ <br />is nct zvzi-a3 �, a _e.a cuotz=_cn w -.ave -J Je su mi==e.. <br />d w_= <br />1C i.^.0 r.+r •9:=•'•'-_ 3 d-erg.^.t a°.-.e used :an.< or a new <br />G <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.