Laserfiche WebLink
WHEREAS, the Silver View Park improvement plan is as follows: <br />SILVER VIEW PARK PLAN <br />Existing Facilities: <br />1. Woodchipped pathway - the Commission requested that staff continue to budget <br />for replacement of wood chips with ag lime (750' x 8' strip) each year in the <br />operations budget. <br />2. Two adult softball fields with irrigation. <br />3. Landscaping - continually rearranged as needed, by forester. <br />4. Paved/curbed parking lot entry. <br />S. Soccer field - plans to connect with softball field irrigation system. <br />6. Yard -surface play court. <br />7. Benches along the pathway. <br />S. One (1) swing bench. r <br />9. Sliding hill. <br />10. Amphitheater - staff suggested possible changes, as the steep sides of the <br />amphitheater are a hazard. Two possible solutions were discussed: <br />a. Use it as a "slide" hill with a variety of different slides such as wave <br />slides and tube slides. <br />b. Using a grader to terrace or more gently slope amphitheater. <br />11. Portable restroom enclosure. <br />12. Signs - additional signs were suggested for each entry point to the park rather <br />than just the two main entries. <br />13. One pathway bridge and a culvert pass. <br />