Laserfiche WebLink
July 24, 1989 <br />Mounds View City Council U-NAPTUVED <br />- Page Six_ _ <br />Regular Meeting --- <br />------------------------ <br />Mr. Minetor Minetor explained this is where the trail is <br />proposed to cross. There are two can <br />to be Crossed, <br />and <br />starmproposed <br />handle a 100 year <br />Councilmember Quick pointed out thpacemecross in <br />nt Of <br />the culvert was planned to allow people <br />that area. <br />Councilmember Blanchard questioned how much the path <br />would be interfecred with if the culvert is not <br />placed at this time. <br />Mr. Minetor explainedthethenuld have <br />a to construct <br />a temporary crossing 2nd <br />er with <br />the culvert. <br />Sue Radermacher, 7421 Parkview, stated she was con- <br />cerned that other vehicles might try to cross the <br />ditch, and she <br />would there, like to see some type of <br />barrier placed <br />Mr. Minetor reviewed the types of barriers <br />available. <br />15. Continued r. <br />Consideration <br />of Proposal <br />for Extension <br />of Woodale Drive <br />and Wetland <br />Alteration <br />Permit for <br />Mounds View <br />Business Park <br />South <br />Mayor Hankner explained there are two unfinished <br />items on the mounds View Business Park South propo- <br />Drivethe wet - <br />sal, the extension of WoodShe explainedddiscussion <br />lands alteration permit. She <br />would be limited to the etlande extension as the <br />City cannot act on the wetlands issue until the <br />School Board mares a decision on it. <br />Tim Nelson, of Everest Development, identified the proposed <br />site On an <br />and tran aerial photo and reviewed the affic flow through the project. <br />cote a <br />of an e He explained one -tenth theproposed9road- <br />wetland would be impacted by <br />position of Everest Develop - <br />Mr. Nelson stated the Wooda <br />ment on the extension of Theyadonagreemwith r <br />break issue for. the project. <br />r <br />Staff that it ie9 <br />ood to provdeasecondaryemer extend <br />me Sheheroadway, <br />access <br />as this would <br />to the project. <br />Mr. Minetor reviewed the proposal for the road <br />ood Drive to the development• <br />extension from Edgew <br />It would be 36' wide, with two tcaffic lanes and <br />one packing lane, with a 9 ton roadway design. <br />e road design is done, <br />also explained how th <br />to <br />