Laserfiche WebLink
(_%� MEMORANDUM <br />Memo To :Michelle Hren, City Planner <br />From :Ric Minetor, City Engineer <br />Date :August. 10, 1989 <br />Subject :Library Site - Development Review Comments <br />The proposed library site plan indicates drainage through storm <br />sewers from the site to the existing storm drainage system, with <br />the -exception of minor sections of each entrance. This is a very <br />good approach to controlling the storm water. I believe the storm <br />sewer was sized for the anticipated flows based on existing <br />zoning; therefore, unless this proposal has greater impervious <br />surface than allowed under existing zoning there should be no <br />adverse impact on the receiving storm sewer. <br />The downstream system is scheduled for major improvement in <br />conjunction with Long Lake Road reconstruction. Storm Water <br />Management fees are therefore applicable to this project unless <br />waived by council. The fees in accordance with Chapter. 25 of the <br />Municipal Code would be $1,723 per acre for a total fee of .• <br />$6,495.71. This fee may have been paid with the Krause -Anderson <br />development of the shopping center, in which case it is <br />appropriate not to charge this fee. <br />I have no other concerns regarding this project. <br />