Laserfiche WebLink
COUNTY ROAD I RECONSTRUCTION (T.H. 10 TO I-35W) <br />POSSIBLE FUNDING SOURCES FOR CITY CONTRIBUTION <br />REVISED DECEMBER 29, 1986 <br />FUND <br />0 <br />a <br />Cj <br />rHV <br />N <br />7 <br />a <br />z <br />e <br />G <br />W <br />p; <br />im <br />ITEM (from <br />Ramsey County <br />ti <br />x <br />W <br />h <br />a <br />x <br />U <br />CF7, <br />Final Feasi— <br />bility Report <br />N <br />C <br />9¢ <br />W <br />w <br />y <br />w <br />h <br />dated 12/15/86 <br />Curb and Gutter <br />+ 29,948 <br />I <br />$ 29,948 <br />Concrete Walk <br />$ 94,0461 <br />$ 96,046 <br />(8' Wide) <br />Storm Sewer <br />$ 40,0002 <br />$103,7692 <br />$143,769 <br />Storm Water Pond <br />$ 15,5002 <br />$ 15,500 <br />Traffic Signals <br />$ 8,125 <br />$ 8,125 <br />$ 16,250 <br />'Quincy Street 6 <br />aunty Road I) <br />Right of Way <br />$ 3,8003 <br />$ 3,800 <br />(Purchase or <br />Highway Easement) <br />Possible Fund <br />$107,971 <br />$ 0 <br />$ 55,500 <br />$133,717 <br />$ 0 <br />$ 8,125 <br />$305,313 <br />Contribution <br />Use <br />$108,000 <br />$ 0 <br />$ 56,000 <br />$134,000 <br />$ 0 <br />$ 8,100 <br />$305,300 <br />All costs are estimates from final feasibility report for County Road I reconstruction <br />prepared by Ramsey County dated 12/15/86. <br />1 A five foot wide concrete sidewalk costa $60,000. <br />2 Ramsey County policy is that cities shall not utilize M.S.A. storm sewer funds on county <br />reconstruction projects. <br />3 Cost may be more if sidewalk is installed on south side of County Road 1. <br />ATTACHMENT 03 <br />