My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1987/01/05
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1987
>
Agenda Packets - 1987/01/05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2025 1:25:02 PM
Creation date
4/23/2025 1:25:02 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
1/5/1987
Description
Regular Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ramsey County Department of Public Works <br />360 St. Peter Street <br />n Suite 270 <br />Saint Paul, Minnesota 55102 <br />nAMSEY COUMY (6121298 4127 <br />I'� r <br />December 18, 1986 G <br />Steven Thatcher <br />City of Mounds View <br />240! Highway 10 <br />Mounds View, Minnesota 55112 <br />County Road I <br />from T.H. 10 to 1-35W <br />Kenneth E. WEltzln <br />Dm ur <br />End <br />C.1y D w <br />Paul L. Klrkwold <br />Deputy Du tlm <br />and <br />Annixi Camp Endnur <br />Five copies of the final feasibility report for County Road I from T.H. 10 to 1-35W <br />are enclosed. Please sign and return one copy for our files. <br />The report has been revised from the draft sent to Mounds View In June in this mannert <br />1. Letters from Mounds View and the Board of Water Commissioners have been <br />added to the appendix. A resolution from the Board of County Commissioners <br />has also been added. <br />2. As you requested, it is no longer assumed that the right of way on the south side <br />of County Road I will be a uniform 43 feet. Some additional permanent and <br />temporary right of way will be required In order to accommodate the proposed <br />construction. This right of way will be acquired at city expense. <br />3. The timeline has been revised to show construction as 1987, rather than 1988. <br />This is an optomistic estimate, but one we will try to attain. <br />4. The sections pertaining to traffic signal participation at County Road I and <br />Quincy Street have been revised, <br />5. A section on handling traffic during construction has been added. <br />6. Cost estimates have been revised to reflect traffic signal and right of way changes. <br />7. Note that the County's public hearing requirements (Public and Agency <br />Involvement) are usually satisfied by a hearing held by the city. <br />
The URL can be used to link to this page
Your browser does not support the video tag.