Laserfiche WebLink
MEMO T0: MAYOR AND CITY COUWL <br />FROM: CLERK-ADMINISTRATC <br />k DATE: DECEMBER 15, 1987 <br />SUBJECT: JACKSON DRIVE AND GROBERG STREET INTERSECTION <br />STORM WATER DRAINAGE <br />It was pointed out to me by Gary Kardell that the City might <br />wish to consider the extension of a stoad ImandwJacksoner tDriveut in <br />on the southeast corner of County <br />as part of the County Road I reconstruction to the <br />irtersect;nn of Jackson Drive and Groberg Street. As some <br />of you prcbably know, this intersection frequently becomes <br />flooded during storm events as a result of the poor drainage <br />that currently exists there. This poor, drainage occurs <br />because of the condition of the ditch on the WeSt side of and <br />Jackson Drive between County Road I and Groberg <br />Streetthe overland drainage to the west to the Landmark Estates <br />ponds. <br />As a result of Gary's suggestions, I requested that City <br />Engineer Dan Boxrud look at this mattes and <br />dprovidewith this <br />recommendations regarding possible way dealing <br />issue. Mr. Boxrud suggests that the storm sewer line be <br />extended along the ditch on Jackson Drive with catch basins <br />being placed en the northeast and southeast corners of the <br />Cintersection and a possible catch basin on the southwest <br />corner of the intersection. This would allow the filling of <br />the ditch on Jackson Drive, which has become a significant <br />maintenance problem for the City dueit the the <br />Mweedsgrowth <br />and <br />View <br />the fact that the children residing round area. Also, by <br />Estates apartments use this as a playg <br />eliminating the pending of water in the intersection of <br />Jackson Drive and Groberg Street it would eliminate traffic <br />hazards experienced during winter months with the <br />development of ice in the intersection and hopefully, reduce <br />the deterioration of the pavement that is occurring at this <br />intersection. <br />Mr. oxrd the cost of <br />constrtion <br />be underu$10,�000aand has tsuggested to meeverbally would <br />that this <br />work could be performed by the contractor for County Road I <br />next spring when they return to the site to finish the catch <br />basin work and paving that remains to be done. I have <br />attached a rough drawi.ne to Mr. Boxrud's memorandum to show <br />the approximate drainage area for this intersectiun as well <br />as the locations of cal-ch basins and storm sewer line. <br />Should Co,incil agree with the recommendation that this work <br />could to done; Staff could negotiate a contract with PCI for <br />the work to be completed next spring with the monies coming <br />from the City's Storm Water Management Fund. Your direction <br />in this matter would be appreciated. <br />DFP/mjs <br />Attachments: <br />