My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda Packets - 1988/01/19
MoundsView
>
Commissions
>
City Council
>
Agenda Packets
>
1980-1989
>
1988
>
Agenda Packets - 1988/01/19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2025 12:57:21 PM
Creation date
4/28/2025 12:57:21 PM
Metadata
Fields
Template:
MV Commission Documents
Commission Name
City Council
Commission Doc Type
Agenda Packets
MEETINGDATE
1/19/1988
Description
Work Session
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 <br />m <br />STREET IWENTORY/FIELD RATING/DATA STORAGE <br />Identification of distress types, visual inspection for <br />quantitative measurements, data entry and retrieval from <br />software. <br />Short -Elliott -Hendrickson, Inc. will: <br />1. Provide field rater(s) to perform field inspections <br />to obtain pavement distress data. <br />2. Enter field data into compute:. <br />3. Retrieve ratings of streets, perform sortings and <br />listings based on priorities. <br />4. SEH provides review and monitor of raters. City <br />personnel •may accompany SEH rating team(s) for <br />training during the field surveys. <br />5. Review utility and storm sewer data for data antry(7� <br />onto software if desired. <br />.Y. <br />ENGINEERING EVALUATION/REPORT AND PRESENTATION <br />Based on condition rating data end City financing methods, <br />determine optimum maintenance measures, prioritized listing, <br />estimated costs and Capital Improvement Program. <br />Short -Elliott -Hendrickson, Inc. will: <br />1. Review results of condition rating survey for a <br />composite analysis of study area. <br />2. Define parameters for maintenance naeds and <br />objectives. <br />3. Categorize and prioritize streets based on <br />maintenance procedures of goal coat, overlay, mill- z <br />overlay and reconstruction. <br />4. Identify need of storm aswor if desired. 7^ <br />5. Estimate coats for maintenance measures on all <br />streets studied. <br />6. Develop a 5 year Capital Improvement Program for <br />major street work and a 5 year Maintenance Program <br />for minor street work. <br />
The URL can be used to link to this page
Your browser does not support the video tag.