Laserfiche WebLink
TERMS AND CONDITIONS OF AGREEMENT BETWEEN I41 <br />OWNER AND CONSTRUCTION MANAGER J <br />ARTICLE 1 <br />CONSTRUCTION MANAGER'S SERVICES AND <br />RESPONSIBILITIES <br />The Construction Manager covenants with the Owner to <br />further the interests cf the owner by furnishing the Con- <br />struction Manager's skill and itidgment in cooperation <br />with, and in reliance upon, the services of an architect. <br />The Construction Manager agrees to furnish business ad- <br />ministration and management services and to perform in <br />an expeditious and economical manner consistent with <br />the interests of the Owner. <br />BASIC SERVICES <br />The Construction Manager's Basic Services consist of <br />the two Phases described below and any other ser- <br />vices included in Article 16 as Basic Services. <br />1.1 PRECONSTRUCTION PHASE <br />1.1.1 Provide preliminary evaluation of the program and <br />Project budget requirements, each in terms of the <br />other. With the Architect's assistance, prepare preliminary <br />estimates of Construction Cost for early schematic designs <br />based on area, volume or other standards. Assist the <br />owner and she Architect in achieving mutually agreed <br />upon program and Project budget requirements and other <br />design parameters. Provide cost evaluations of alternative <br />materials and systems. <br />1.1.2 Review designs during their development. Advise <br />on site use and improvements, selection of materials, <br />building systems and equipment and methods of Project <br />delivery. Provide recommendations on relative feasibility <br />of construction methods, availability of materials and la- <br />bor, time requrements for procurement, installation and <br />construction, and factors related to cost including, but not <br />limited 'n, costs of alternative designs or materials, pre- <br />:iminary budgets and possible economies. <br />1.1.3 Provide for the Architect's and the Owner's review <br />and acceptance, and periodically update, a Project Sched- <br />ule that coordinates and integrates the Construction Man- <br />ager's services, the Architect's services and the Ownees <br />responsibilities with anticipated construction schedules. <br />1.1.4 Prepare for the Owner's approval a more detailed <br />estimate of Conslructio!� Cost, as defined in Article 3, de- <br />veloped by using estima'ing techniques which anticipate <br />the various elements of the Project, and based on Sche- <br />matic Design Documents prepared by the Architect. Up- <br />date and tefine this estimate periodically as the Archite ' <br />prepares Design Development and Consl- :(ion Docu- <br />ments. Ad.ise the Owner and the Architect if it appears <br />that the Construction Cost may exceed the Project budget. <br />Make recommendations for corrective action. <br />1.1.5 Coordinate Contract Documents by consulting with <br />the Owner and the Architect regarding Drawings and Spe- <br />cifications as they are being prepared, and recommending <br />alternative solutions whenever design details affect con- <br />struction feas;bihty, cost or schedules. <br />1,1.5.1 P.: vide tecommendations acid information Io the <br />Owner and the Architect regarding the assignment of re- <br />sponsibilities for safety precautions and programs; tempo- <br />rary Project facilities; and equipment, materials and ser. <br />vices for common use of Contractors. Verify that the re- <br />quirements and assignment of responsibilities are included <br />in the proposed Contract Documents. <br />1.1.5.7 Advise on the separation of the Project into Con- <br />tracts for various categories of Work. Advise on the method <br />to be used for selecting Contractors and awarding Con- <br />tracts. If separate Contracts are to be awarded, review the <br />Drawings and Specifications and make recommendations <br />as required to provide that (1) the Work of the separate <br />Contractors is coordinated, (2) all requirements for the <br />Project have been assigned to the appropriate separate <br />Contract, (3) the likelihood of jurisdictional disputes has <br />been minimized, and (4) proper coordination has been •. <br />provided for phased construction. :. <br />1.1.5.3 Develop a Project Construction Schedule provid- <br />ing for all major elements such as phasing of construction . <br />and times of commencement and completion required of <br />each separate Contractor. Provide the Project Construc- <br />tion Schedule for each set of Bidding Documents. <br />1.1.S.4 Investigate and recommend a schedule for the <br />Owner's purchase of materials and equipment requiring <br />long lead time procurement, and coordinate the schedule <br />with the early preparation of portions of the Contract <br />Documents by the Architect. Expedite and coordinate de- <br />livery of these purchases. <br />1.1.6 Provide an analysis of the types and quantities of <br />labor required for the Project and review the availability <br />of approp;.ale categories of labor required for critical <br />Phases. Make recommendations for actions designed to <br />minimize adverse effects of labor shortages. <br />1.1.6.1 Identify or verify applicable requirements for <br />equal employment opportunity programs for itlA,usion in <br />the proposed Contract Documents. <br />1.1.7 Make recommendations for pre -qualification cri. <br />teria for Bidders and develop Bidders' interest in the Pro- <br />ject. Establish bidding schedules. Assist the Architect in <br />iswing Bidding Documents to Bidders. Conduct pre -bid <br />conferences to familiarize Bidders with the lidding Docu- <br />ments and management techniques and with any special <br />systems, materials or methods. Assist the Architect with <br />the receipt of questions from Bidders, and with the issu- <br />ance of Addenda. <br />1.1.7.1 With the Architect's assistance, receive Bids, pre- <br />pare bid analyses and make recommendations to the <br />Owner for award of Contracts or rejection of Bids. <br />1.1.8 With the Architect's assistance, conduct pre -award <br />conferences with successful Bidders. Assist the Owner in <br />preparing Construction Contracts and advise the Owner <br />on the acceptability of Subcontractors and material sup- <br />pliers proposed by Contractors. <br />12 CONSTRUCTION PHASE <br />The Construction Phase will commence with the <br />award of the initial Construction Contract or pur.� <br />chase order and, together with the Construction <br />Manager's obligation to provide Basic Services un. <br />AIA DO MMIN111a1 • 0\\'Nl4C0NSIYL-010N A171, N111' GA(I AVEI. I\ur1\'A96A GIITION C. AIA BBB1-1cB8 2 <br />4114W • IIu AMER It e4111•'ll 01 ARE IIIIIC Is. <br />