Initials: b--- X
<br />ry Contract, m \fork! Mainlainl
<br />nut if'hrecords, in dupl
<br />care of principal t u.lding layout lines, elevation: of the
<br />bnhom of footings, fluor levels and key site elevations
<br />cerlified by a qualified sur.eynr or professional engineer.
<br />Make all records available In The Owner and the Archi-
<br />lect. At the completion of the Project, deliver all such
<br />records to the Architect for the Owner. protection and
<br />1.2.12 Arrange for deh%ery and storage, p toms and
<br />security for Owner -purchased n._:zrials, sy's
<br />equipment which are a part of the Project. until such
<br />items are incorporated into the Project.
<br />1.2.13 With the Architect and the 0%%ner's maintenance
<br />personnel, observe the Contractors' checkout of utilities,
<br />operational slstems and equipment for readiness and as-
<br />sist in their initial start-up and testing.
<br />1.2.14 when the Construction Manager considers each
<br />Contractor's work or a designated portion thereof sub-
<br />stantially complete, the Construction Manager shall pre-
<br />pare for the Architect a list of incomplete or unsatisfactory
<br />items and a schedule for their completion. The Construe
<br />Iron ,.tanager shall assist the Architect in conducting in•
<br />spections. Alter the Architect c0ibes the Date of Substan•
<br />fiat Completion of the \fork, the Constri,0011 anal e
<br />shall coordinate the correction and completion
<br />Wcl. k.
<br />1.2.15 Assist the Architect in determining when the Proj-
<br />e•t or a designated portion thereof is substanhaliy com-
<br />plete. Prepare for The Architect a summary of the status of
<br />the %Fork of each Contractor, listing changes in the previ•
<br />uush• issued Certificates of Substantial Completion of the
<br />%%ark and recommend`•,,, the times within which Contrac-
<br />tor, shall complete uncompleted items on their Corlificate
<br />C. Substantial Completion of the Work.
<br />1.2.16 following the Architect's issuance of a Certificate
<br />o: Substantial Completion of the Project or designated
<br />potion thereof, evaluate the completion of the Work of
<br />the Contractors and make recommendations to the Archt-
<br />Tect \\hen Work is ready for final ection. Assist the
<br />Architect in conducting final inspections. Secure and trans•
<br />mit to the Diviner required guarantees, affidavits, releases,
<br />bands and waivers. Deliver all keys, inalluals, record
<br />eta%%ings and maintenance stocks to the Owner.
<br />1 2.17 The extent of the duties, responsibilities and limi•
<br />tawuns of authority o? the Construction Ma^zger as a rep-
<br />re>enr+me of the Owner during construction shall not be
<br />modified or extended wilhout the written consent of the
<br />ct and
<br />,c.n %an gehe `avhichors, the consen!Sshallenot bethe unreasonsruc
<br />ably
<br />s.0theld.
<br />1.3 ADDITIONAL SERVILES
<br />The If" ',vine Additional Services IIshallbeper
<br />formed .Pon authorization F from
<br />the
<br />O%%ner and sha!l be paid for as provided in this
<br />Agreement.
<br />13.1 Services related to im•estigatnns. appraisals or eval-
<br />:. tlon> of exishng conditions, facilities or equipment, or
<br />:cr;ncahon of the accuracy, of existing dra%%ing% or other
<br />Inu,rmation furn,%hed by the Owner.
<br />13.2nhSeande equipment � related In �hichr err Im11 aluparttu of fur
<br />the
<br />14uject.
<br />1.3.3 Services for leant oriental spaces.
<br />fire Consultation
<br />cau v dui ng c viuttio,aand afurnmagsh ned g
<br />services in conjunclion with the replacement of such
<br />work.
<br />13.5 Services made necesszry by the default of a Con-
<br />tractor.
<br />1.3.6 Prep? . to serve or serving as a witness In con-
<br />nection with any public hearing, arbitration proceeding
<br />or legal proceeding.
<br />1.3.7 Recruiting or training maintenance personnel.
<br />1.3.8 Inspections of, and services related to, the Project
<br />after the end of the Construction Phase.
<br />1,3,9 Providing at.y other services not otherwise included
<br />in this Agreement.
<br />1.4 TIME
<br />1.4.1 The C^nslruclion Manager shall perform Basic and
<br />ServicesAdamonal a
<br />1Y as is consistent with
<br />reasonable skill andcare and lthe sorderly progress of the -
<br />Project.
<br />ARTICLE 2
<br />THE OWNER'S RESPONSIBILITES
<br />2.1 The Owner shall provide full information regarding :
<br />the o
<br />requirements nt the Project, including a p B .
<br />which shall set forth the owner'sobjectives, constraints
<br />and criteria.7lf{ligffiRtXR0.4Def!Xt7A`ASPRA'SLxMC7E�
<br />sty4�C>Ek�cel�cxacAltAAxc01'ihckl{X79Ct7ttT10R'is'�AWA� .,:
<br />tRul�AkaasdcsWslemmocssSaO<xs:ftodxofA0.tkaA
<br />2.2 The Owner shall1rictLidaca budget for the Project, to be
<br />kygpgxxp.Mmiskaefotmick the Construction Manager alndc
<br />�xxAr.�irm�, which shall include contingencies for bid- 0
<br />ding, changes during construction and other costs which
<br />are the responsibility of the owner. JTk1tA"rA"1Xxk
<br />>cxxwGa>:ssxstxketfio�:�melosbmcxss>aafzeAtpsss�d[x»��x
<br />Rxs�zdlf u�stnxila5da><assshecR�txm>d#��°1�':
<br />niative
<br />author-
<br />ized toe inethe shall
<br />0% nerssate a behalfewitheah
<br />respecttothe
<br />Project. The Owner, or such authorized representative,
<br />shall examine documents submitted by the Construction
<br />Manager and shall render decisions pertaining thereto
<br />Promptly to avoid unreasonable delay in the progress of
<br />.,-- AAar,Avnriservices.
<br />2.5 The Owner shall furnish in
<br />spections d re-
<br />xiOeocioakaAdaXkAxkdonAsta><xtxx's
<br />ports as required by law or the Contract Documents.
<br />2.6 The Owner shall furnish such legal, accounting and
<br />nsurance counseling services as may be necessary for the
<br />Pinjc•c6 including such auditing services as the Owner®
<br />May require to verify the Project Applications for Payment
<br />Boot-1980 4
<br />AlAuocusa 191Y1 . b\\`Ixl,nNxbl flu♦A%ACA611: ALxIl "IN i A\\I'\\1.IIP/,1111\�IIf ?Y'Y
<br />1 review and approve
<br />r.... un .\mcu A: r.Ann a of Axunnl I. rr. r.nv %ills An . 2 prepared by