Laserfiche WebLink
Public Works Staff Report <br />City Hall Campus <br />• Trail gate installation off Edgewood Dr. on trial near splash pad (Summer 2025) <br />• Splash Pad testing and start up <br />Groveland Park: <br />• Mowing <br />Greenfield Park: <br />• Mowing <br />Hillview Park: <br />• Mowing <br />• Mowing <br />Oakwood Park <br />• Soccer field setup <br />• Mowing <br />Hodges Park <br />• Mowing <br />Silver View Park <br />• Lacross and baseball line painting <br />• (Alderlink Construction Masters) has constructed two rain infiltration basins just north of H2 flats <br />apartments and reconstructed two basins near the south Silverview sign on H2. <br />• (Aderlink Construction) 75% of invasives have been removed from all around the pond, 50% of <br />invasives have been stump treated. Starting on constructing two rain gardens on the south side of <br />the pond, large tree removals occurring on the west side of the pond. <br />What to look for in the next month: <br />-Additional stump spraying <br />- Sump basins installation on Lake Court Dr. <br />- Reconstruction of forebay on the West side of the pond <br />- New 48" culvert installation under the trail near the forebay <br />2 1 P a g e <br />