Laserfiche WebLink
Public Works Staff Report <br />Ardan Park <br />• (Winberg Companies) Pond water Quality Project. Stantec full site ecological inspection. <br />• (Winberg Companies) are going to complete forb dormant seed planting in November 2025 <br />• Three new Balsom Fir trees planted <br />City Hall Campus <br />• Splash pad winterizing <br />• Shade canopy removals <br />• Clearing off Canada goose waist from BCBS surface, waist is staining the light blue rubber <br />BCBS black dirt work, preparation for ribbon cutting <br />Groveland Park: <br />• Leaf Mulching and trash and litter checks <br />Greenfield Park: <br />• Leaf Mulching and trash and litter checks <br />• Batting cage net removal <br />• Some rough cutting <br />• Painting ballfield storage building, graffiti on two sides of the building <br />Hillview Park: <br />• Leaf mulching and trash and litter checks <br />Lambert Park <br />• Leaf mulching and trash and litter checks <br />Oakwood Park <br />• Leaf mulching and trash and litter checks <br />Hodges Park <br />• Leaf mulching and trash and litter checks <br />• New swings and old dinosaur installations <br />Silver View Park <br />• (Alderlink Construction Masters) marked trees with orange X for removal in late fall after frost is <br />in the ground <br />• Full Stantec ecological SV pond water preservation project site inspection competed <br />• Nonselective spraying of native groundcover sites <br />• New zipline installations <br />• Full site dormant native ground cover planting starting in November 2025 <br />Woodcrest Park <br />• Leaf Mulching <br />2 1 P a g e <br />