My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09082015
StAnthony
>
City Council
>
City Council Packets
>
2015
>
CC PACKET 09082015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2015 9:22:02 AM
Creation date
9/9/2015 8:41:34 AM
Metadata
Fields
Template:
City Council
Meeting Date
9/8/2015
Meeting Type
Regular
Document Type
Council Agenda/Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />2016 STREET AND UTILITY IMPROVEMENT PROJECT <br />FEASIBILITY REPORT <br />CITY OF ST. ANTHONY VILLAGE <br />WSB PROJECT NO. 2170-13 PAGE 1 <br />1. EXECUTIVE SUMMARY <br />This project has been entitled the 2016 Street and Utility Improvement Project. The <br />project proposes the following: <br /> <br />Street & Utility Reconstruction <br /> Stinson Boulevard NE from 37th Avenue NE to Silver Lane NE <br /> 37th Place NE from 37th Avenue NE to Stinson Boulevard NE (located within the <br />City of Columbia Heights) <br /> <br />This Feasibility Report outlines the proposed reconstruction of approximately 1,800 <br />feet of 42-foot urban section street complete with bituminous paving and concrete <br />curb and gutter. Also proposed is the replacement of approximately 1,860 feet of <br />water main and approximately 1,500 feet of sanitary sewer main. The installation of <br />new storm mains and new storm sewer catch basins is also proposed. <br /> <br />Trail & Sidewalk Improvements <br /> 6' concrete walk along the east side of Stinson Boulevard NE between 37th <br />Avenue NE and Silver Lane NE (proposed to be completed under a separate <br />Highway Safety Improvement Program (HSIP) project later in the fall of 2016; <br />however, this future work will be accommodated by this project). <br /> 8' bituminous trail along the west side of Stinson Boulevard NE between 37th <br />Avenue NE and 40th Avenue NE (this is a Columbia Heights improvement). <br /> Salo Park sidewalk replacement. <br /> <br />Railroad Crossing Improvements <br /> Replace existing crossing on Stinson Boulevard NE located between 37th Avenue <br />NE and 37th Place NE (this design anticipates the future HSIP project being <br />constructed). <br /> <br />Signal Improvements <br /> Upgrade existing signal system at the intersection of Stinson Boulevard NE and <br />39th Avenue NE (this signal upgrade is part of the HSIP project, the roadway <br />improvements will accommodate those future improvements). <br /> <br />Decorative Lighting <br /> East side of Stinson Boulevard NE between 37th Avenue NE and Silver Lane NE. <br /> <br />The estimated project cost for the street and utility reconstruction is approximately $3.90 <br />million. Funding for the project will come from the City’s Street and Utility <br />Reconstruction Funds (Public Improvement Bonds), cost participation funds with the <br />City of Columbia Heights, Municipal State Aid Funds (MSAS), and special assessments <br />to benefitting properties. <br /> <br />45
The URL can be used to link to this page
Your browser does not support the video tag.