Laserfiche WebLink
<br /> <br />2016 STREET AND UTILITY IMPROVEMENT PROJECT <br />FEASIBILITY REPORT <br />CITY OF ST. ANTHONY VILLAGE <br />WSB PROJECT NO. 2170-13 PAGE 2 <br />The reconstruction project can be completed, including the first lift of bituminous and all <br />restoration items, in 2016. The final lift of bituminous is proposed to be installed in June <br />of 2017. <br /> <br />This project is feasible, necessary, and cost effective from an engineering standpoint and <br />should be constructed as proposed herein. <br /> <br /> <br />46