My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09082015
StAnthony
>
City Council
>
City Council Packets
>
2015
>
CC PACKET 09082015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2015 9:22:02 AM
Creation date
9/9/2015 8:41:34 AM
Metadata
Fields
Template:
City Council
Meeting Date
9/8/2015
Meeting Type
Regular
Document Type
Council Agenda/Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />2016 STREET AND UTILITY IMPROVEMENT PROJECT <br />FEASIBILITY REPORT <br />CITY OF ST. ANTHONY VILLAGE <br />WSB PROJECT NO. 2170-13 PAGE 9 <br />4.6 Detour Routes <br /> <br />The project will require significant excavation and disposal of unacceptable material <br />from the existing street area and a supply of significant volumes of select granular base, <br />aggregate base, and bituminous pavement materials. This effort will require closing the <br />roads under construction and increasing loaded truck traffic on the streets adjacent to the <br />construction area. Adequately signed detours will be identified to direct traffic around the <br />construction zones and notify users of the increased truck and construction activity. In <br />order to accommodate the property owners along the excavated roads, temporary parking <br />on the adjacent streets may be necessary during the periods when vehicle access is not <br />possible. <br />53
The URL can be used to link to this page
Your browser does not support the video tag.