My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 10132015
StAnthony
>
City Council
>
City Council Packets
>
2015
>
CC PACKET 10132015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2015 9:08:12 AM
Creation date
11/30/2015 8:57:26 AM
Metadata
Fields
Template:
City Council
Meeting Date
10/13/2015
Meeting Type
Regular
Document Type
Council Agenda/Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Regular Meeting Minutes <br />September 8, 2015 <br />Page 6 <br /> <br /> 1 <br />Street & Utility Reconstruction 2 <br />• Stinson Boulevard from 37th Avenue NE to Silver Lane NE 3 <br />• 37th Place N from Stinson Boulevard to 37th Avenue NE (Columbia Heights 4 <br />Improvements) 5 <br /> 6 <br />Trail and sidewalk Improvements 7 <br />• 8’ bituminous trail along west side of Stinson Boulevard between 37th Place N and 40th 8 <br />Avenue NE (Columbia Heights improvements) 9 <br />• Salo Park sidewalk replacement 10 <br /> 11 <br />Railroad Crossing Improvements 12 <br />• Replace existing crossing on Stinson Boulevard NE located between 37th Avenue NE and 13 <br />37th Place NE (This design anticipates the future HSIP project being constructed) 14 <br /> 15 <br />Decorative Lighting and sidewalk Improvements 16 <br />• Ease side of Stinson Boulevard NE between 37th Avenue NE and Silver Lane NE 17 <br /> 18 <br />The timing on this project was revised in June 2015. They have received a number of complaints 19 <br />due to the condition of Stinson Blvd as well as some water main breaks. The sidewalk 20 <br />improvements will be done with the HSIP program. 21 <br /> 22 <br />Mr. Messner stated the Sanitary Sewer will be replaced with an 8-inch plastic pipe along with all 23 <br />the manholes. There are actually two sanitary sewers along this roadway and Columbia Heights 24 <br />does not plan to replace their sanitary sewer at this time however they will replace all manholes. 25 <br /> 26 <br />Mr. Messner stated a number of drainage improvements will be done in the area. The project 27 <br />cost is $3.9M. 35% of the improvements are assessable in the residential areas. The City will 28 <br />apply for State Aid funding for these improvements. Mr. Messner reviewed the St. Anthony 29 <br />Funding Sources, assessable and City portions, and Columbia Heights participation in the cost. 30 <br />He reviewed the funding sources as Special Assessments, Street & Utility Reconstruction Funds 31 <br />and Municipal State Aid Funds. 32 <br /> 33 <br />Mr. Messner reviewed the Project Schedule. Construction would begin in May 2016 and final 34 <br />paving would be done in June 2017. 35 <br /> 36 <br />Councilmember Jenson asked what percentage the MSA would pay and Mr. Messner stated the 37 <br />City is eligible to request the total amount for street reconstruction and a calculation of the storm 38 <br />sewer reconstruction can be requested. Within the next few years we will start incurring a State 39 <br />Aid Fund balance. We will make the claim and as money is put back into the fund it will be 40 <br />returned to us for use. It generally runs between 55-60% of participation on the State side for the 41 <br />storm sewer. 42 <br /> 43 <br /> 44 <br />Mayor Faust asked if it would be safe to say that because we have been building roads, that we 45 <br />used up our MSA credit with the State. Whereas if we haven’t been building roads we would 46 <br />8
The URL can be used to link to this page
Your browser does not support the video tag.