My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 10132015
StAnthony
>
City Council
>
City Council Packets
>
2015
>
CC PACKET 10132015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2015 9:08:12 AM
Creation date
11/30/2015 8:57:26 AM
Metadata
Fields
Template:
City Council
Meeting Date
10/13/2015
Meeting Type
Regular
Document Type
Council Agenda/Packets
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City Council Regular Meeting Minutes <br />September 8, 2015 <br />Page 5 <br /> <br /> 1 <br />V. REPORTS FROM COMMISSION AND STAFF - NONE. 2 <br /> 3 <br />VI. GENERAL BUSINESS OF COUNCIL. 4 <br /> 5 <br />A. Resolution 15-055 a resolution Authorizing Acquisition of Easements for the Highway 6 <br />Safety Improvement Program. 7 <br /> 8 <br />Mr. Justin Messner, Acting City Engineer, reviewed for Council consideration is a resolution 9 <br />authorizing the presentation of offers for permanent easement, temporary easement, and cost to 10 <br />cure for Highway Safety Improvement Project in the amount of $105,075.00. This project 11 <br />includes the following improvements: 12 <br /> 13 <br />1. Sidewalk on the south side of 37th Avenue from Stinson Boulevard to Highcrest Road 14 <br />2. Sidewalk on the east side of Stinson Boulevard from 37th Avenue to Silver Lane 15 <br />3. Intersection improvements throughout the City of St. Anthony Village. 16 <br /> 17 <br />Mr. Messner noted the cost to cure element is something different from our typical City 18 <br />projects. Cost to cure is the cost to reimburse residents for damages or replacement of fences, 19 <br />retaining walls, trees, or other items located within the limits of construction for the Highway 20 <br />Safety Improvement Project that the City will not replace with the project. On typical City 21 <br />projects, St. Anthony Village would replace and restore items that were removed by the project. 22 <br />Landowners will be compensated for the losses under the Federal rules, and the homeowner will 23 <br />replace trees and fences as they desire. 24 <br /> 25 <br />The project will commence during the construction season in 2016. Appraisals totally $105,075 26 <br />were obtained for easements. He provided a list of the parcels and total compensation. 27 <br /> 28 <br />Councilmember Stille asked why easements were needed for this street reconstruction, as he 29 <br />does not recall this ever being done in the past. Mr. Messner stated work needs to be done into 30 <br />the existing right-of-way. This is necessary to get the federal grant. 31 <br /> 32 <br />Mayor Faust noted if any cure is necessary, the Federal grant will reimburse the residents for any 33 <br />cures necessary for items removed. 34 <br /> 35 <br />Motion by Councilmember Brever, seconded by Councilmember Jenson, to adopt Resolution 15-36 <br />055 a resolution Authorizing Acquisition of Easements for the Highway Safety Improvement 37 <br />Program. 38 <br /> 39 <br />Motion carried unanimously. 40 <br /> 41 <br />B. Resolution 15-056 a resolution Receiving Feasibility Report and Ordering Plans and 42 <br /> Specifications for the 2016 Street and Utility Improvements 43 <br /> 44 <br />Acting City Engineer, Mr. Justin Messner presented the 2016 Street and Utility Feasibility 45 <br />Report for the following improvements: 46 <br />7
The URL can be used to link to this page
Your browser does not support the video tag.