Laserfiche WebLink
Mr. David M. Childs <br />• June 2, 1982 <br />Page 4 <br />(f) Who will be responsible for handling legal work? <br />Holmes do Graven, Chartered. <br />Is the cost included in the fees as presented? <br />Yes, with the exception of legal service as bond counsel and <br />condemnation proceedings as otherwise referenced herein. <br />(g) Who will be responsible for handling construction management? <br />The proposal of Holmes do Graven does not include construction <br />management other than the coordination of land acquisition, <br />disposition, and relocation. We would see the City's engineer as <br />probably the most appropriate to handle this technical function. <br />However, we would be in a position to subcontract this function out. <br />Is the cost included in the fees as presented? <br />No. <br />• (h) Who will be responsible for handling land surveys? <br />Subcontract <br />Brauer & Associates, Ltd., Inc. <br />7901 Flying Cloud Drive <br />Eden Prairie, Minnesota 55344 <br />Contact: Fred L. Hoisington <br />The firm of Brauer do Associates has assisted a number of public <br />sector and private sector clients. The firm is versed in all aspects of <br />land use planning, design, landscape architecture, and. engineering. <br />Is the cost included in the fees as presented? <br />No. Same rationale as highlighted in 2(a) above. <br />(3) Briefly describe the methodology you will use to locate an <br />interested/qualified developer developers. <br />We would prefer to remain flexible regarding this phase and in a timely <br />manner review with the City Manager the then appropriate options based on <br />the dictates of the project's goals, objectives and timetables. We believe to <br />suggest either a very limited informal local search or an elaborate regional <br />• or national search would be premature at this time. To some extent the <br />methodology may be directly related to the ultimate method of disposition <br />