Laserfiche WebLink
COST ESTIMATE <br /> This cost estimate is based on visual review of the condition of the existing streets and <br /> our recommended method of repair. Minor cracking and spalling that were determined <br /> not to effect the structural ability or drive ability of the pavements, were ignored. . Also, <br /> any defects that a soils investigation and televising of the storm sewer would find are <br /> not included. <br /> The cost estimate for the repair of each street is as follows: <br /> 33rd Avenue <br /> Unit Unit <br /> Repair Method Ouantity Price Total <br /> -1. Joint Repair, Type A 10,000 LF $1.75 $17,500.00 <br /> 2. Joint Repair, Type B 1,000 LF 14.00 14,000.00 <br /> 3. Crack Repair, Type A 2,000 LF 1.75 3,500.00 <br /> 4. Crack Repair, Type B 750 LF 15.00 11,250.00 <br /> 5. Spot Surface Repair 1,000 SF 17.00 17,000.00 <br /> 6. Edge Repair 400 SF 17.00 6,800.00 <br /> 7. Full Depth Repair 500 SF 10.00 5,000.00 <br /> 8. Full Panel Replacement 20,000 SF 6.50 130,000.00 <br /> 9. Traffic Control Lump Sum. 8,000.00 8.000.00 <br /> Subtotal $213,050.00 <br /> +10% Contingency 21.305.00 <br /> Subtotal $234,355.00 <br /> +15% Engineering 35.153.00 <br /> TOTAL $269,508.00 <br /> 37th Avenue <br /> Unit Unit <br /> Repair Method Ouantity Price Total <br /> 1. Joint.Repair, Type A 5,000 LF $1.75 $8,750.00 <br /> 2. Joint Repair, Type B 1,000 LF 14.00 14,000.00 <br /> 3. Crack Repair, Type A 2,000 LF L75 3,500.00 <br /> 4. Crack Repair, Type B 750 LF 15.00 11,250.00 <br /> 5. Spot Surface Repair 500 SF 17.00 8,500.00 <br /> 6. Edge Repair 100 SF 17:00 1,700.00 <br /> 7. Full Depth Repair 400 SF 10.00 4,000.00 <br /> 8. Full Panel Replacement 4,000 SF 6.50 26,000.00 <br /> 9. Traffic Control Lump Sum 5,000.00 5.000.00 <br /> Subtotal $82,700.00 <br /> +10 Contingency 8.270.00 <br /> Subtotal $90,970.00 <br /> +15% Engineering 13.645.00 <br /> TOTAL $104,615.00 <br /> -6- <br />