My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 06271989
StAnthony
>
City Council
>
City Council Packets
>
1989
>
CC PACKET 06271989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:38:01 PM
Creation date
12/30/2015 4:37:29 PM
Metadata
Fields
SP Box #
18
SP Folder Name
CC PACKETS 1987-1989
SP Name
CC PACKET 06271989
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stinson Blvd. <br /> Unit Unit <br /> Repair Method Ouantity Price Total <br /> 1. Joint Repair, Type A 2,000 LF $1.75 $3,500.00 <br /> 2. Joint Repair, Type B 500 LF 14.00 7,000.00 <br /> 3. Crack Repair, Type A 750 LF 1.75 1,312.50 <br /> 4. Crack Repair, Type B 500 LF 15.00- 7,500.00 <br /> 5. Spot Surface Repair 200 SF 17.00 3;400.00 <br /> 6. Edge Repair 100 SF 17.00 1,700.00 <br /> 7. Full Depth Repair 150 SF 6.50 975.00 <br /> 8. Full Panel Replacement 1,000 SF 6.50 6,500.00 <br /> 9. Traffic Control Lump Sum 3,000.00 3.000.00 <br /> Subtotal $34,887.50 <br /> +10% Contingency 3.488.75 <br /> Subtotal $38,376.25 <br /> +15% Engineering 5.756.00 <br /> TOTAL $44,132.25 <br /> Chandler Drive <br /> Unit Unit <br /> Repair Method Ouantity Price Total <br /> 1. Joint Repair, Type A 4,500 LF $1.75 $7,875.00 <br /> 2. Joint Repair, Type B 750 LF 14.00 10,500.00 <br /> 3. Crack Repair, Type A 1,500 LF 1.75 2,625.00 <br /> 4. Crack Repair, Type B 1,000 LF 15.00 15,000.00 <br /> 5. Spot Surface Repair 2,000 SF 17.00 34,000.00 <br /> 6. Edge Repair 750 SF 17.00 12,750.00 <br /> 7. Full Depth Repair 1,000 SF 10.00 10,000.00 <br /> 8. Remove and Replace <br /> Concrete Pavement 2,950 SF 35.00 103,250.00 <br /> 9. Concrete Curb & Gutter 1,200 LF 6.50 7,800.00 <br /> 10. Traffic Control Lump Sum 5,000.00 5.000.00 <br /> Subtotal $208,800.00 <br /> +10% Contingency 20.880.00 <br /> Subtotal $229,680.00 <br /> +15% Engineering 34.452.00 <br /> TOTAL $264,132.00 <br /> If repair of Chandler Drive is broken into two phases, Phase 1 would cost $140,000.00 <br /> and Phase 2 would be $124,132.00. <br /> The total combined cost of repair is.$682,387. This .cost would be reduced by $61,000 if <br /> the City were to maintain and repair Type A joints and cracks. <br /> -7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.