My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 04252000
StAnthony
>
City Council
>
City Council Packets
>
2000
>
CC PACKET 04252000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:13:37 PM
Creation date
12/30/2015 4:13:04 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 04252000
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
79 <br /> • hearing before the Planning Commission as set forth in Section 115 of this Code. The plan <br /> shall include the following: <br /> (a) Overall maximum PUD density range. <br /> (b) General location of major streets and pedestrian ways. <br /> (c) General location and extent of public and common and open space. <br /> (d) General location of residential and nonresidential land uses with approximate type of <br /> intensities of development. <br /> (e) Staging and time schedule of development. <br /> (f) Other special criteria for development. <br /> Subd. 4. Final Development Plan. Following general concept development approval, if given, <br /> the applicant shall submit the final development stage application and final plat. The <br /> application shall proceed and be acted upon in accordance with 1655.03 for zoning district <br /> changes. If appropriate, because of the limited scale of the proposal, the concept stage and <br /> development stages may proceed simultaneously. <br /> (a) Schedule: <br /> • <br /> (1) Developer meets with the City Planner to discuss the proposed developments. <br /> (2) The applicant shall file the concept plan application and preliminary plat, <br /> together with all supporting data. <br /> (3) Within thirty (30) days after verification by the City Planner that the required <br /> plan and supporting data is adequate, the Planning Commission shall hold a <br /> public hearing as provided for in Section 115 of this Code. <br /> (4) The Planning Commission shall conduct the hearing and report its findings and <br /> make recommendations to the City Council. The procedure shall be that set <br /> forth in Section 115 of this Code. <br /> (5) The City may request additional information from the applicanf concerning <br /> operational factors or retain expert testimony at the expense of the applicant <br /> concerning operational factors. <br /> (6) If the Planning Commission fails to make a report within ten (10) days after <br /> completion of the hearing, then the City Council may proceed as provided for in <br /> Section 115 of this Code without the report. The City Council shall assign an <br /> • ordinance numerical reference to each final plan and PUD agreement text <br /> approved. The City Council may attach such additional conditions as it deems <br />
The URL can be used to link to this page
Your browser does not support the video tag.