Laserfiche WebLink
a <br /> LAY N E MINNESOTA • WATER WELLS • WATER TREATMENT <br /> • PUMPS DRILLED PIER FOUNDATIONS <br /> 3147 CALIFORNIA ST. NE <br /> MINNEAPOLIS, MN 55418 <br /> (612)781.9553 <br /> February 15, 1984 <br /> - City of St. Anthony <br /> 3301 Silver Lake Road <br /> St. Anthony, MN 55418 <br /> Attn: Larry Hamer <br /> Director of Public Works I <br /> Re: Cost estimate for abandonment of Well #2 <br /> i <br /> Dear Larry, <br /> The following is our estimate of the time and materials required to complete <br /> final abandonment of your well #2: <br /> a Shop time getting concrete pump serviced and ready <br /> 3 hrs. @ $67.00/hr. $ 201 .00 <br />` • <br /> Pump i 2 men and the concrete <br /> p g, pump to place the neat <br /> concrete grout <br /> Estimated 12 hours @ 8145.00/hour 1 ,740.00 <br /> Estimated 15 cu. yds. of neat cement grout <br /> @ $ 120.00/cu.yd. 1 ,800.00 <br /> Ready-mix truck stand-by @ 875.00/hour no estimate <br /> City of St. Anthony to furnish one man to clean 2" cement pipe after <br /> removal from well . <br /> This estimate is based on information gained by the Minnesota Geologic <br /> I <br /> Survey. It should be stressed the quantity of grout is an estimate and <br />:t <br /> could vary. <br /> If you require any additional information, please contact me. <br /> Sincerely, <br /> LAYNE INNESOTA COMPANY <br /> r <br /> im Eulberg, P.E. <br /> Contract Engineer <br /> Copy to Chuck .A I berg <br /> World's most complete water service organization <br /> LAYNE 6 BOWLER.INC. • INFILCO DEGREMONT INC • WALLACE 8 TIERNAN <br />