My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 01301987
StAnthony
>
City Council
>
City Council Packets
>
1987
>
CC PACKET 01301987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:02:06 PM
Creation date
12/30/2015 4:01:35 PM
Metadata
Fields
SP Box #
16
SP Folder Name
CC PACKETS 1981-1984 & 1987
SP Name
CC PACKET 01301987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. aOil 'e hou <br /> M'TDAA'1C1E : A P PROV L IVV <br /> December 18, 1986 T V6 ��2L <br /> TO : <br /> Mayor and Councilmembers, City Manager Vw� <br /> F ROM : Larry Hamer, Public Works Director <br /> 11 TEM : REMODELING OF THE CITY HALL AT PARKVIEW <br /> COST INFORMATION <br /> All costs listed below are based on quotations we have already received. <br /> 1. Electrical <br /> * Remove and replace the lights in the main office with 2 X 4 <br /> lay-in lights: $750.00 <br /> * Wire air conditioner: $325.00 <br /> 2. Remodeling Cost (by Public Works) <br /> • Lower ceiling: $600.00 <br /> • Materials: sheet rock, lumber, and door: $250.00 <br /> • Miscellaneous supplies: $250.00 <br /> • Smoked glass panes: $150.00 <br /> 3. Install Central Air Conditioning <br /> * 3-1/2 ton central air conditioners set pad; ducting to split offices <br /> so they can control their own thermostats (2) ; 12 lay-in type ceiling <br /> diffusers and return air grills; one year warranty on parts and <br /> labor: $6,690.00 <br /> 4. Carpet <br /> * Public Works will remove old carpet. <br /> * 198-1/3 yards of Logo commercial grade carpet at $6.99 per yard with <br /> material for installation: $1,416.32 <br /> * Labor to install carpet: $644.57 <br /> City offices can be remodeled for approximately $11,075.89. <br /> This total does not include any changes to the inner offices with the <br /> exception of central air, nor the remodeling of the restrooms. <br /> Additionally, in the event City offices are every relocated, the proposed <br /> central air system can be removed and re-installed. <br /> cjk <br />
The URL can be used to link to this page
Your browser does not support the video tag.