My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 01121988
StAnthony
>
City Council
>
City Council Packets
>
1988
>
CC PACKET 01121988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:26:55 PM
Creation date
12/30/2015 4:26:37 PM
Metadata
Fields
SP Box #
18
SP Folder Name
CC PACKETS 1987-1989
SP Name
CC PACKET 01121988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ST. ANTHONY BOULEVARD <br /> CONSTRUCTION COST ESTIMATE <br /> REV. 4/28/87 <br /> UNIT <br /> ITEM DESCRIPTION QUANTITY UNIT PRICE TOTAL <br /> 1 Mobilization 1 LS $10,000.00 <br /> 2 Remove Curb 5,600 LF 3.00 1,800.00 <br /> 3 Remove Concrete w/ 2" <br /> Bituminous Overlay 10,000 SY 5.75 57,500.00 <br /> 4 Remove Catch Basins 4 EA 200.00 800.00 <br /> 5 Remove Storm Sewer 75 LF 2.50 187.50 <br /> 6 Unclassified Excavation 8,000 CY 2.25 18,000.00 <br /> 7 Geotextile Fabric 16,800 SY 2.00 33,600.00 <br /> 8 Aggregate Base Class 3 9,400 TON 5.50 51,700.00 <br /> 9 Aggregate Base Class 5 7,620 TON 7.25 55,24.5.00 <br /> 10 2331 Bituminous Base 1,010 TON 12.50 12,625.00 <br /> 11 2331 Bituminous Binder 750 TON 12.50 9,375.00 <br /> 12 2341 Bituminous Wear 750 TON 14.50 10,875.00 <br /> 13 Bituminous Material for Mix 138 TON 150.00 20,700.00 . <br /> • 14 Tack Coat 875 GAL 1.50 1,312.50 <br /> 15 B618 Concrete Curb & Gutter 5,600 LF 5.00 28,000.00 <br /> 16 Concrete Driveway Pavement 300 SY 20.00 6,000.00 <br /> 17 Construct Batch Basins 4 EA 1,000.00 4,000.00 <br /> 18 12" RCP CL IV 75 LF 20.00 1,500.00 <br /> 19 6" Drain Tile 770 . LF 10.00 7,700.00 <br /> 20 Topsoil & Seed 2,000 SY 1.75 3,500.00 <br /> 21 Pavement Marking 1 LS 600.00 600.00 <br /> 22 Lighting Cross Conduit 400 LF 4.00 1,600.00 <br /> 23 Remove & Replace Signs 1 LS 1,000.00 1,000.00 <br /> 24 Erosion Control 1 LS 1,000.00 1,000.00 <br /> 25 Temporary Construction Signs 1 LS 2,000.00 2,000.00 <br /> 26 Field Office 1 LS 2,500.00 2,500.00 <br /> 27 Saw Existing Pavement 170 LF 4.00 680.00 <br /> Subtotal $358,800.00 <br /> Contingencies 12,200.00 <br /> ESTIMATED CONSTRUCTION COST $371,000.00 <br /> ENGR.-LEGAL-ADMIN. 56,000.00 <br /> ESTIMATED PROJECT COST $427,000.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.