My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 03291988
StAnthony
>
City Council
>
City Council Packets
>
1988
>
CC PACKET 03291988
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:28:40 PM
Creation date
12/30/2015 4:28:11 PM
Metadata
Fields
SP Box #
18
SP Folder Name
CC PACKETS 1987-1989
SP Name
CC PACKET 03291988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
171
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BENSHOOF & ASSOCIATES, INC. <br /> TRANSPORTATION AND LAND USE CONSULTANTS <br /> 7901 FLYING CLOUD DRIVE,SUITE 119/EDEN PRAIRIE,MINNESOTA 55344/(612)944-7590 <br /> March 7, 1986 REFER TO FILE: 88-34-07 <br /> M E M O R A N D U M <br /> TO: Mr. Robert Galush, Twin City Federal <br /> FROM: James A. Benshoor andc�.Jon M. Wertje <br /> RE: Traffic Engineering Study for Twin City Federal <br /> Bank - Apache <br /> PURPOSE AND SUMMARY <br /> The purpose of this memorandum is to document our traffic <br /> engineering analysis for the Twin City Federal branch <br /> located in St. Anthony. The analysis focuses on the <br /> potential impacts of expanding the drive-up by two lanes <br /> • plus a bypass lane and assessing the bank's parking needs. <br /> The analysis process included conducting existing traffic <br /> counts and assessing the impacts of the proposed drive-up <br /> expansion. Conclusions from the analysis are: <br /> Six percent of the existing bank traffic is orientated <br /> to/from the east on 39th Avenue. Because of this small <br /> percentage, the proposed drive-up expansion will have <br /> no significant effect on 39th Avenue east of the bank. <br /> The drive-up expansion will alleviate the on-site <br /> traffic congestion which occurs at peak periods by <br /> providing additional capacity for the drive-up <br /> operation. <br /> It is recommended that 11 additional parking spaces be <br /> added to the bank site to allow customers parking along <br /> 39th Avenue to park on-site. <br /> A parking area east of the building is recommended to <br /> provide three spaces for drop-off/pick-up functions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.