Laserfiche WebLink
MUNICIPAL STATE-AID STREET SYSTEM <br /> • 5-Year Construction Program For 1990 <br /> (State Aid Expenditures Only) <br /> REVENUE <br /> Present State aid Construction Balance September 1 , 198 9= $ 254,856.00 <br /> Estimated Annual Construction Allotment $ 145,000 X 4 = $ 580,000.00 <br /> Lstimated Total State Aid Allotment for Programming Purposes $ 834,856.00 <br /> ESTIMAT.°.D EXPZNDITURES <br /> 'Estimated <br /> Year State Aid <br /> of <br /> Exienditure Termini Project Descriotion Expenditure <br /> On Stinson Blvd. @ 37th Ave. Traffic signals <br /> From Joint Powers Agreement <br /> 1990 To with Columbia Heights $ 30,000 <br /> Length and Hennepin County <br /> On Chandler Drive Concrete slab replace <br /> From 37th Avenue ment, crack and joint <br /> 1990 To Foss Road sealing $ 264.000 <br /> Length 1 ,850 feet <br /> on <br /> From <br /> 1991-1992 To $ <br /> Length <br /> on Stinson Blvd. Concrete slab replace- <br /> From 37th Avenue ment,crack and joint <br /> 1993 To 1 ver Lane sealing. Joint Powers S 45.000 <br /> Length 900 fppt with Columbia Heights. <br /> On 37th Avenue Concrete slab replace- <br /> From Winson Blvd. ment, crack and joint <br /> 1994 To Si ver Lake Road sealing. $ <br /> Length 2:200 feet <br /> • On Wilson Street Reconstruct street to <br /> From St. Anthony Blvd. MSA standards and storm <br /> 1995 To 33rd_ Avenue sewer. $ 350,000 <br /> Length 3,200 feet . <br />