Laserfiche WebLink
Apache Mall Structural Evaluation <br /> Page 7 <br /> Mobil Service Station: <br /> 1. Remove contaminated soil and replace with clean <br /> engineered fill. <br /> 2 . Repave the areas on all sides of the building which <br /> have been disturbed by removal of contaminated <br /> soils. <br /> 3 . Repair the deficiencies presented in the <br /> Architect's report. <br /> Cost of Remedial Work <br /> Tabulations of cost estimates for the remedial work have been <br /> prepared and are presented in the Appendix. Replacement <br /> costs were calculated on a square foot basis for new <br /> construction of similar facilities. Renovation costs were <br /> estimated using historical data received from the Architect, <br /> Mechanical Engineer, and a Contractor. Estimating this type <br /> of work is a difficult process. The estimated costs and the <br /> extent of repairs needed are based on opinion and visible <br /> conditions. other conditions may exist which were not <br /> visible or readily apparent which may result in increased <br /> repair costs. Therefore, estimates can change in the future <br /> due to economic conditions, time of construction, extent of <br /> repair, etc. <br /> Conclusions <br /> The three (3) buildings evaluated are all "structurally sub- <br /> standard" and require significant renovation to upgrade them <br /> to code compliance. Replacement cost for the New Market <br /> building is approximately $2, 534, 000. 00. Renovation cost is <br /> approximately $906, 641 or 35.8% of replacement cost. <br /> Replacement cost for the Sports and Health Club is <br /> approximately $353 ,790. Renovation cost is estimated to be <br /> $119, 352 or 33 .7% of replacement cost. Replacement of the <br /> service station is approximately $107, 175. Renovation costs <br /> are estimated at $22, 600 or 21. 0% without addressing the <br /> contaminated soil issue. <br />