Laserfiche WebLink
Apache Mall Structural Evaluation <br /> Page 6 <br /> New Market Grocery Building: <br /> .1. Remove all existing roofing and replace with a new <br /> roof system. <br /> 2. Install tapered insulation under the new roof <br /> system to accommodate the 1992 State Building Code <br /> requirement of 1/4" per foot of roof slope to <br /> interior roof drains. <br /> 3 . Remove the Tectum roof deck and replace it with a <br /> standard metal roof deck. <br /> 4 . Add roof drains and scuppers as required to meet <br /> State Building Code requirements for drainage and <br /> overflow. <br /> 5. Plumb and reinforce the east and west walls <br /> replacing brick facing as necessary. <br /> 6. Add insulation to the exterior walls. <br /> 7. Repair code deficiencies presented in the <br /> Architect's report. <br /> 8 . Repair mechanical systems per the Mechanical <br /> Engineer's report. <br /> 9. Connect the roof diaphragm to the east and west <br /> masonry walls. <br /> Sports and Health Club: <br /> 1. Remove and replace the exterior wall covering. <br /> 2 . Remove and replace a portion of the mechanical <br /> systems. <br /> 3 . Repair the roof system as necessary. <br /> 4 . Repair the deficiencies presented in the <br /> Architect's report. <br />