My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08251992
StAnthony
>
City Council
>
City Council Packets
>
1992
>
CC PACKET 08251992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 8:18:26 PM
Creation date
12/30/2015 8:18:03 PM
Metadata
Fields
SP Box #
30
SP Folder Name
CC PACKETS 1990-1994
SP Name
CC PACKET 08251992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Apache Mall Evaluation <br /> Mechanical Systems <br /> File: L9253COI <br /> Page 2 <br /> 2. Replace each of four rooftop. heating, cooling, and ventilating units. with four new <br /> rooftop heating, cooling, and ventilating units. The existing units were installed shortly <br /> after the building was constructed and are near the end of their useful.life. <br /> 3. Install new rooftop relief hoods to relieve excess air when the units are-running in their <br /> economizer cycle. All of the existing relief hoods should be removed as part of the roof <br /> replacement. <br /> 4. Replace all existing rooftop exhaust fans serving toilet rooms. All other exhaust fans <br /> should be removed as part of the roof replacement. <br /> All other building modifications such as adding exhaust systems or plumbing are specific to <br /> new tenant needs. The building water and sewer services appear adequate for any plumbing <br /> needs typical for a building of this type. <br /> SPORTS AND HEALTH BUILDING - 7,862 SQ FT <br /> Mechanical System Improvements: <br /> 1. Replace the heating, cooling, and ventilating system with new rooftop units. The <br /> existing heating, cooling, and ventilating units are near the end of their useful life. <br /> 2. Replace the existing exhaust systems for the toilet room and locker room areas. The <br /> existing exhaust fans are near the end of their useful life. <br /> 3. Exhaust and make-up air for whirlpool area.. <br /> MOBILE SERVICE STATION BUILDING - 19429 SQ FT <br /> Mechanical System Improvements: <br /> 1. Replace the existing heating and ventilating systems with new heating and ventilating <br /> systems. <br /> Yours very truly, <br /> CHASNEY ASSOCIATES, INC. <br /> Stanley M. Chasney P.E. <br />
The URL can be used to link to this page
Your browser does not support the video tag.