My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 09081992
StAnthony
>
City Council
>
City Council Packets
>
1992
>
CC PACKET 09081992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 8:18:49 PM
Creation date
12/30/2015 8:18:29 PM
Metadata
Fields
SP Box #
30
SP Folder Name
CC PACKETS 1990-1994
SP Name
CC PACKET 09081992
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Snow/Ice Control Policy <br /> Page 5 <br /> 3.03 Street snow control <br /> a. Maintenance personnel will be alerted when two (2) inches of snow <br /> have accumulated and snow continues to fall. The normal start time <br /> for snow emergency plowing operations and following day(s) clean- <br /> up is 12:00 A.M.. Major accumulations will require additional plowing <br /> of arterial streets during "rush hours", etc., to allow vehicle travel. All <br /> calls should be made to the Public Works Department so that the <br /> Public Works Department has time to make main roads passable: <br /> b. Given equal snow conditions, arterial routes will be plowed first. <br /> Arterial routs are established to have an "early plowed" route within <br /> approximately one-fourth (1/4) mile of each residence. State and <br /> County highways are part of the arterial route plan. <br /> 3.04 Sidewalk arterial system snow control <br /> o Snow control will be snow removal only, no salt/sand will be applied. <br /> No area will receive special emphasis; follow-up passes will be made <br /> to maintain passable travel. Designated sidewalks will be plowed as <br /> soon as possible after the snowfall. <br /> 3.05 City designated facilities snow and ice control <br /> a. Public Works personnel will plow snow from parking lots and <br /> sidewalks when notified or by a decision based on weather forecasts <br /> or obvious conditions. <br /> b. Public Works personnel will salt/sand parking lots when necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.