My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08241999
StAnthony
>
City Council
>
City Council Packets
>
1999
>
CC PACKET 08241999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:09:19 PM
Creation date
12/30/2015 4:09:01 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 08241999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AUG. 9.1999 11:46AM DHA/KELLISON NO.525 P.3i4 <br /> piazuung Co=issioners ; <br /> July 30, 1999 <br /> -Page-2 ' <br /> The rendering'developed.for the building shows the use•of a maj'or'ponidn of the existing facade <br /> . revitalized using expansion J'.o*i is and n w'color coati:g f stucco in co.njunction with tl <br /> q <br /> : introduction of brick-elements at toe crown corner and the outrances:as well as under the new <br /> windows. The•new sterefrorit windows Apd doorway areas Will have a tinted glass set.into ; <br /> factory painting,window mullions"in a turq4oise-grp='f1nish.'All of the colors and•finisheS us' d <br /> in.the buq#g are in conformance with the guidelines est4blished.in the Kenzie Terrace. <br /> Redevelopment Project Area plan. T,heye'st and-south faces of the building will be renovated . <br /> and repainted with colors to itnitate the face of the building.' A new roof will be inst4lled over. <br /> the eritixe project•and'nevv copingmaterial will be installed at,the parapet wails, All hogt ngand <br /> air,'conditioning units on the roof, whether Visible'or not,will be painted to blend with'the colors <br /> of the building. . <br /> We have put together a oompreller}sive signage lilan for this project for your review md• ; <br /> recommendation.to the City POurlcil. 'T'he Hitching Post is subject to marketing �,greoments with' <br /> manufacturers mucli like an automobile.dealership wbuld'be subjected to if they soJ4 <br /> Ford/Mproury/Lindoln products.:The sign plansubmitted is sensitive to the.sign intent of the <br /> City and is,considera,te-of the-adjacent.shppping center. Each of•the manufacturers signs will be <br /> constructedwith:similar materials in a similar style to provide a cohesive signage pattern for the <br /> building. The main building•sign, The Hilchilig P.pst, will-be,constructed of individual channel. <br /> letter as'will additional si a. a indicatiti the service entralice and service doors. <br /> s as wl 1 gn � . , g . . . . <br /> The rgidoring of the building is,inclusive of all signs being applied.for. The total square footage <br /> of•signage on the east.face of the building.is 180 square feet comprised of five sips of Y X 12' <br /> each;, .'Phis,exceeds the ordinance allowance of 150 square feet,,however,-15% of the wall <br /> footage would allow for 309 square'feet and'the other'computation is.an allowannce of 252 square <br /> feet at'rivo square feet Pet lineal foot of building face, On the north exPosure'cf the building, we <br /> are asking fora total 172 square feet"of ipage where thebr'dinance oiice.again.allows for a- <br /> maximum of 150;square feat, 'Based op the square footage of wallL.area at 15%, vye would be <br /> allowed 493 square feet&nd*at two -feet per lineal foot;we would be allowed•328 square <br /> fget of'signage, Due to-the unique r;aturq of tlne, m4rlceting requirements of the manufacturers of <br /> products being sold,we believe th�.t At'ticle 1$00,13.• Adjustments and Appeals•Subdivision 2, , <br /> SOp4agraph (2) would apply to'alloO for atn exeinption fiorn'the hieral provisions of the <br /> signage ordiulances, We believe tbat,there is a specific hardship-with respect to this particular. ; <br /> individual'property due to the,marketin�-requirements ozd'that'Subparagraphs A and,B-of this <br /> provision would apply. It would be possible for'fhe'Hitcl�g post to accomplish its signage <br /> needs-with the explicit.requiremeizts of the ordi Once by using sip' 4'ge for its products in the ' <br /> windows, but we, as I am surd the City concurs, feel that this would detract from the appeal'of <br /> the project, If our requested comprehensive signage plan is approved,The Hitching Post will <br /> agree, to not install any wirldovy Aignage. ; <br /> 'Parking lot.fighting sta4daids have,bieet-located on floe plan where we.estimate-the•light will be ' <br /> reclvired, tiVe are cantinuing out process with the City for 4 cohesive.aa�,�000rdinated lighting <br />
The URL can be used to link to this page
Your browser does not support the video tag.