My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 08241999
StAnthony
>
City Council
>
City Council Packets
>
1999
>
CC PACKET 08241999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:09:19 PM
Creation date
12/30/2015 4:09:01 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 08241999
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
..AUG. 9. 1999 11:47AM DHA/KELLISON NO.525 P.414 <br /> Planning Commissioners <br /> July 30, 1909 <br /> . Page 3 <br /> -'plan for the entiro-sbopping center district and therefore the plan,as shown may be anieaded upon <br /> a final decision for the entire redevelopment area,' Also, We have shown on the site plan . <br /> locations for exteridr wall,tmounted•shoe-box type light fixtures at security locations on the west <br /> and south elev4tionS of the building, The canopy on the nortli'•faee of the building will-have light <br /> fixtures,provided fof down lighting only under the canopy area. <br /> Due to the nature of the trash that is generated„ including large cardboard boxes a4d wood <br /> pallets, The)iitching Post would be placing a 30;yard enclosed rubbish bin on the south side of . <br /> the build 4g'whicb would be'attached to the building for easy loading from within. The bin itself <br /> is'approx#ately $'Wide by 30'long by 8'high. The bin Will be fully loaded approximately every . <br /> t` q weeks and a tntcic will come to remove that bin-aad•replace it with an empty bin, This will <br /> eliminate the number of tras$trucks and.the noise attended thoreto in floe normal loading arid' <br /> unloading of small three yard dumpster type bins. Also this assures that fhe cardboard and <br /> pallets that are disposed of will be in an enclosed facility: A screen wall will be placed at the <br /> south side.of the building to screen the,bin front the adjacedt property,' ; <br /> The Hitehiug Post and IZellison Company are very much looldng'forward to working with St. <br /> Anthoiiy in the finalization'of the site design arnd`the subsequent renovatioti of the building, 'This <br /> . ' will be a great start on redeveloping your City Gateway. <br /> Respectfully yours, <br /> r es 1 . Kellison <br /> P sident <br /> JEKJjjv <br /> • c: Jim Furs eth,-The Hitching.Post, <br />
The URL can be used to link to this page
Your browser does not support the video tag.