Laserfiche WebLink
Extension of Bids <br /> WSB Project: Pahl Avenue Pond Construction <br /> Project Location: City of St.Anthony,Hennepin County,Minnesota Checked By:N.Marshall <br /> Project Nos: WSB Project No.1065-271 Date: 07/17/00 <br /> Denotes corrected figure <br /> Low Bidder 2nd Low Bidder 3rd Low Bidder 4th Low Bidder <br /> Base Bid $55,982.00 $55,192.50 $62,300.00 $62,803.00 <br /> Base Bid+Alternate No.1 $79,782.00 $81,984.50 $84,300.00 $96,803.00 <br /> G L Contracting Inc Land Recycling Svc Inc Doboszenski&Sons Inc Arnt Constr Co Inc <br /> Line Item Estimated Unit Estimated Unit Unit Unit <br /> No. Number Description Unit Quantity Price Cost Price Cost Price Cost Price Cost <br /> Surface Improvements-Base Bid Addendum No.1 not acknowledged <br /> 1 2021.501 Mobilization(2%Max) Lump Sum 1.00 $1,200.00 $1,200.00 $800.00 $800.00 $1,200.00 $1,200.00 $1,070.00 $1,070.00 <br /> 2 2101.502 Clear Trees Each 12.00 $100.00 $1,200.00 $225.00 $2,700.00 $175.00 $2,100.00 $175.00 $2,100.00 <br /> 3 2101.507 Grub Trees Each 12.00 $100.00 $1,200.00 $100.00 $1,200.00 $175.00 $2,100.00 $50.00 $600.00 <br /> 4 2503.541 15"RC Pipe Design 3006 Class V LF 42.00 $52.00 $2,184.00 $66.50 $2,793.001 $35.00 $1,470.00 $62.00 $2,604.00 <br /> 5 2506.602 Furnish&Install 15"RCP Apron w/Trash Guard Each 2.00 $1,500.00 $3,000.00 $865.50 $1,731.00 $690.00 $1,380.00 $1,475.00 $2,950.00 <br /> 6 DIV 2 Foundation Removal and Site Clearance Each 4.00 $750.00 $3,000.00 $1,800.00 $7,200.00 $1,800.00 $7,200.00 $3,025.00 $12,100.00 <br /> 7 DIV 2 Disconnect and Remove Utilities Each 4.00 $1,850.00 $7,400.00 $450.00 $1,800.00 $1,500.00 $6,000.00 $1,200.00 $4,800.00 <br /> 8 DIV 2 Pond Excavation CY 4,700.00 $7.59 $35,673.00 $7.52 $35,344.00 $8.50 $39,950.00 $7.32 $34,404.00 <br /> 9 DIV 2 Seeding(Incl.Topsoil,Mulch&Fertilizer) Acre 0.75 $1,500.00 $1,125.00 $2,166.00 $1,624.501 $1,200.00 $900.001 $2,900.00 $2,175.00 <br /> Total Base Bid $55,982.00 1 $55,192.50 $62,300.00 $62,803.00 <br /> G L Contracting Inc Land Recycling Svc Inc Doboszenski&Sons Inc Arnt Constr Co Inc <br /> Line Item Estimated Unit Estimated Unit Unit Unit <br /> No. Number Description Unit Quantity Price Cost Price Cost Price Cost Price Cost <br /> Alternate No.1 -Demolition of Building <br /> 10 1 DIV 2 1 Building Demolition �E�ach4.00 $5,950.00 $23,800.00 $6,698.00 $26,792.00 $5,500.00 $22,000.00 $8,500.00 $34,000.00 <br /> Total Alternate No.1 1 $23,800.00 1 1 $26,792.0011 1 $22,000.0011 1 $34,000.00 <br /> Total Base Bid+Alternate No.1 $79,782.00 $81,984.50 $84,300.00 $96,803.00 <br /> F:\Wpwin\1065-27\Excel\Bidtab.xis Page 1 of 3 <br />