Laserfiche WebLink
Extension of Bids <br /> WSB Project: Pahl Avenue Pond Construction <br /> Project Location: City of St.Anthony,Hennepin County,Minnesota Checked By:N.Marshall <br /> Project Nos: WSB Project No.1065-271 Date: 07/17/00 <br /> Denotes corrected figure <br /> Low Bidder Bid Rejcted-No Bid Security Provided <br /> Base Bid $55,982.00 $48,001.57 <br /> Base Bid+Alternate No.1 $79,782.00 $65,103.57 <br /> G L Contracting Inc Landworx Excavating <br /> Line Item Estimated Unit Estimated Unit <br /> No. Number Description Unit Quantity Price Cost Price Cost <br /> Surface Improvements-Base Bid <br /> 1 2021.501 Mobilization(2%Max) Lump Sum 1.00 $1,200.00 $1,200.00 $750.00 $750.00 <br /> 2 2101.502 Clear Trees Each 12.00 $100.00 $1,200.00 $100.00 $1,200.00 <br /> 3 2101.507 Grub Trees Each 12.00 $100.00 $1,200.00 $100.00 $1,200.00 <br /> 4 2503.541 15"RC Pipe Design 3006 Class V LF 42.00 $52.00 $2,184.00 $86.23 $3,621.60 <br /> 5 2506.602 Fumish&Install 15"RCP Apron w/Trash Guard Each 2.00 $1,500.00 $3,000.00 $1,035.00 $2,070.00 <br /> 6 DIV 2 Foundation Removal and Site Clearance Each 4.00 $750.00 $3,000.00 $1,839.99 $7,359.97 <br /> 7 DIV 2 Disconnect and Remove Utilities Each 4.00 $1,850.00 $7,400.00 $125.00 $500.00 <br /> 8 DIV 2 Pond Excavation CY 4,700.00 $7.59 $35,673.00 $6.50 $30,550.00 <br /> 9 DIV ISeeding(Incl.Topsoil,Mulch&Fertilizer) Acre 0.75 $1,500.00 $1,125.00 $1,000.00 $750.00 <br /> Total Base Bid $55,982.00 $48,001.57 <br /> G L Contracting Inc Landworx Excavating <br /> Line Item Estimated Unit Estimated Unit <br /> No. Number Description Unit Quantity Price Cost Price Cost <br /> Alternate No.1 -Demolition of Building <br /> 10 DIV 2 Building Demolition Each 4.00 $5,950.00 $23,800.00 $4,275.50 $17,102.00 <br /> Total Alternate No.1 $23,800.00 $17,102.00 <br /> Total Base Bid+Alternate No.1 $79,78270 $65,103.57 <br /> F:\Wpwin\1065-27\Excel\Bidtab.xls Page 3 of 3 <br />