My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 01092001
StAnthony
>
City Council
>
City Council Packets
>
2001
>
CC PACKET 01092001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:19:33 PM
Creation date
12/30/2015 4:19:08 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 01092001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12/11/00 MON 13:45 FAX 6514825232 RAMSEY CO PUBLIC WORKS Ghnn9 <br /> ®® Department of Public Works <br /> Kenneth G.Haider,P.E.,Director and County Engineer <br /> • ® ENGINEERING/OPERATIONS <br /> ADMINISTRATION&AND SURVEY 3377 N.Rice Street <br /> 50 West Kellogg Blvd.,Suite 910 Shoreview, MN 65126 <br /> RAM"Ell uN1Y St.Paul,MN 65102• (661)266-2600•Fax 266-2615 (651)484-9104•Fax 432.5232 <br /> E-mail:Public.Works @co.ramsey.mn.us <br /> December 11, 2000 <br /> Mr. Mike Kalscheur <br /> Assistant Director—Real Estate <br /> TOLD Development Company <br /> 6385 Old Shady Oak Road <br /> ,Suite 120 <br /> Eden Prairie,Minnesota 55344 <br /> Dear Mr. Kalscheur: <br /> The Ramsey County Public Works Department has reviewed the proposed site plan and <br /> survey for construction of a Walgreens store in Saint Anthony at 37`h Avenue and Silver <br /> Lake Road: <br /> Ramsey County has the following comments regarding access and traffic flow. <br /> I. Ramsey County is in agreement with the proposed access configuration on Silver <br /> Lake Road. This includes closing the two existing access points and constructing a <br /> new right in/right out access to Silver Lake Road immediately north of the existing <br /> northern access point. <br /> 2. An existing catch basin is in place on Silver Lake Road where the new driveway is <br /> proposed. This catch basin will need to be relocated to the north. You may wish to <br /> consider shifting the driveway slightly to the south in order to avoid this catch basin. <br /> 3. The County is still in the process of completing the construction of the bridge north of <br /> this site. This will include median installation, bituminous overlay and restoration <br /> next spring. We will coordinate our work with the development of this site to avoid <br /> any possible duplication of efforts. <br /> 4. An access permit from Ramsey County will be required. We would prefer if the <br /> developer rather than the contractor acquired this permit. This can be done in the <br /> spring prior to construction and can be coordinated through myself. <br /> • <br /> Minnesota's Fhst Home Bale County <br /> printed on xeyclnd pppnt p'IM R tnmlmam o!1p7S poehconeumat contsnt <br />
The URL can be used to link to this page
Your browser does not support the video tag.