Laserfiche WebLink
Ak - 8441 Wayzata Boulevard, Suite 350 B.A.Mittelstc 101 <br /> WSB <br /> Minneapolis, MN 55426 Bret A.w' <br /> P Peter R.Willenbnn�,P.E. <br /> • Donald W.Sterna,P.E. <br /> tel: 763-541-4800 Ronald B.Bray,P.E. <br /> &Associates, Inc. fax: 763-541-1700 <br /> December 7,2000 <br /> Ms. Sue Henry- <br /> Assistant City Manager <br /> City of St Anthony <br /> 3301 Silver Lake Road <br /> St.Anthony, MN 55418-1699 <br /> Re: Review of Proposed Walgreen's Site in the City of St.Anthony <br /> WSB Project No. 1065-52 <br /> Dear Sue: <br /> The following documents regarding the above site have been received and reviewed: <br /> • Pond outlet control structure detail;hydrologic calculations;preliminary site plan faxed on 11/30/00,prepared by <br /> Sigma Development,Inc. <br /> • Site plan submittal prepared by Told Development Co.,dated 11/30/00. <br /> Based on our review of the above documents and conversations with the City staff and the developer, the following <br /> comments are made: <br /> • The proposed westerly entrance to the site from 37'h Avenue North should be aligned with Belden Drive on the <br /> south side of 37'Avenue: ... <br /> • • Access permits to Silver Lake Road and 37' Avenue will need to be acquired from the County and copies <br /> submitted to the City of St.Anthony. <br /> • The proposed site discharges directly to Silver Lake. Therefore,treatment to NURP recommended standards will <br /> be required. However, due to site restrictions, it is suggested that a 5:1 slope could replace the 10:1 bench <br /> requirement at the normal water elevation. <br /> • The developer should receive approval of the development plan from the MPCA. <br /> • Due to existing soil contamination,the pond should be lined to address any concerns of the MPCA. <br /> • The outlet from the proposed ponding area should provide skimming for floatable materials. This may be <br /> accomplished by submerging the outlet pipe below the normal water elevation. In regard to the proposed outlet <br /> structure,the top of casting on the manhole should be an open grate set at an elevation below the overflow so as <br /> to provide an emergency outlet in the case that the primary outlet is plugged or iced up during spring conditions. <br /> If you have any'questions regarding this matter,please call me at(763)277-5782. <br /> Sincerely, <br /> WSB&Associates,Inc. <br /> Todd E. Hubmer,P.E. <br /> Project Manager <br /> so c: Chip Leedom, Sigma Development,Inc. <br /> Mike Kalscheur,Told.Development,Inc. <br /> nm <br /> M i n n e a p o l i s S t . C l o u d <br /> Infrastructure Engineers Planners FAWPWnau065-52v20700-Sn.WPc <br /> EQUAL OPPORTUNITY EMPLOYER <br />