My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CC PACKET 03132001
StAnthony
>
City Council
>
City Council Packets
>
2001
>
CC PACKET 03132001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 4:20:43 PM
Creation date
12/30/2015 4:20:17 PM
Metadata
Fields
SP Box #
17
SP Folder Name
CC PACKETS 1999-2001
SP Name
CC PACKET 03132001
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Probable t <br /> Summary of Maintenance Costs <br /> This is a summary of the cost to maintain the existing building without its conversion to <br /> Teen Center <br /> Masonry cleaning,restoring and repairs $ 10,000-$ 12,000 <br /> New Acoustical Tile for Upper level $ 15,000-$20,000 <br /> 2 new HC restrooms @ $3,000 Ea. $ 6,000—$8,000 <br /> Concrete floor modification for upper level $ 15,000-$20,000 <br /> Enclosure walls for Electrical and Mech.Rooms $ 4,000 -$5,000 <br /> Sub.Total $50,000—$65,000 <br /> Concrete ramp addition at the exterior and $ 10,000-$ 15,000 <br /> ADA related minor alteration <br /> TOTAL $60,000 -80,000 <br /> Summary of Probable Costs to Convert <br /> Convert the existing building to a public owned Teen Center as recommended. <br /> Interior remodeling of 11,500 SF* @ $20-$25 per square foot $230,000-$287,000** <br /> Site Improvements $100,000—$120,000 <br /> Maintenance cost described above $ 60,000-$80,000 <br /> Total cost of remodeling and Improvement $390,000—480,000*** <br /> * Assuming only one floor will be remodeled <br /> ** This cost does not include furnishing and installation of the elevator <br /> *** Additional ESA detailed inspection expense,if required,may be included in this cost <br /> Note: Since SEH has no control over the cost of labor,materials,equipment or services furnished by <br /> others,or over the Contractor's methods of determining prices,or over competitive bidding or market <br /> conditions,the opinions of probable budget costs provided herein are made on the basis of the <br /> Engineer/Architect's best judgement as an experienced engineer/architect,familiar with the construction <br /> industry. SEH does not guarantee that proposals,bids or actual construction costs will not vary from <br /> opinions of probable cost prepared by the Engineer/Architect. <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.