My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 09191995
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
1995
>
PL PACKET 09191995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 5:30:43 PM
Creation date
12/30/2015 5:30:23 PM
Metadata
Fields
SP Box #
20
SP Folder Name
PL PACKETS 1995
SP Name
PL PACKET 09191995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER 4 TRANSPORTATION 77 <br /> Metering could also have an impact on local roadways. Vehicles waiting in line at <br /> ramps may cause localized traffic problems. Those ramps which are not yet metered include <br /> I-35W and County Road E2 southbound, I-35W and County Road D north and southbound, <br /> and I-694 and Long Lake Road north and southbound. Metering may also divert traffic from <br /> the metropolitan highway system to other roads. This emphasizes the need for an adequate <br /> minor arterial system. Fortunately, New Brighton's minor arterial system is adequate to <br /> accommodate shorter trips (less than five miles), eliminating these trips from the <br /> metropolitan highway system. <br /> The Metropolitan Council also recommends that high-occupancy vehicle (HOV) lanes be <br /> provided where additional lane capacity is needed on the metropolitan highway system. <br /> However, because of serious funding constraints and the long process required to implement <br /> major highway projects, adding lanes to the metropolitan highway system is unlikely-before <br /> the year 2000. Therefore, travel-demand management strategies are critical to maintain good <br /> regional accessibility. <br /> FINDINGS: NIINOR ARTERIALS/INTERSECTIONS <br /> SILVER LAKE ROAD <br /> Silver lake road is a minor arterial which is deficient in roadway capacity, load capacity, <br /> and vertical alignment. Projected traffic volumes for Silver Lake Road are greater than the <br /> capacity of the existing roadway. <br /> Therefore, in 1992, Ramsey County plans to reconstruct Silver Lake Road from Silver <br /> Lane to I-694. Silver Lake Road will be widened along the entire length of the project to <br /> provide a system of left turn lanes, or center median, or a combination of the two, such that <br /> no left turns will be made be made from a through lane. The proposed section from Silver <br /> Lane to 7th Street is a five lane roadway with two through lanes in each direction along with <br /> a center left turn lane. Four foot wide medians are proposed on the approaches to the <br /> signalized intersections at Silver Lane, County Road E, 5th Street, and 7th Street. <br /> In the more densely developed residential area between 5th Street and 7th Street, an <br /> alternate to the five lane design is being considered. This alternate consists of providing a <br /> narrow raised center median rather than a center left turn lane to minimize right-of-way <br /> acquisition. <br /> The proposed design of the Silver Lake Road at 7th Street/Forestdale Road intersection <br /> is to leave the two minor street approaches offset and to prohibit northbound left turns to <br /> Forestdale Road by a center median extending into the intersection. <br /> The vertical alignment of the existing road will be improved to provide a minimum 40 <br /> mph stopping sight distance on Silver Lake Road. Retaining walls will be necessary in areas <br /> of substantial vertical alignment change. <br />
The URL can be used to link to this page
Your browser does not support the video tag.