My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 09191995
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
1995
>
PL PACKET 09191995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 5:30:43 PM
Creation date
12/30/2015 5:30:23 PM
Metadata
Fields
SP Box #
20
SP Folder Name
PL PACKETS 1995
SP Name
PL PACKET 09191995
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHAPTER 4 TRANSPORTATION 79 <br /> economic approach to street maintenance, repair and replacement work as well as a cost <br /> effective program to phase out non-permanent streets. <br /> ACCIDENT SPOT MAP <br /> A review of the accident spot map (Map 10) shows no unusual traffic accident problem. <br /> As would be expected, the number of accidents at the various intersections correlates closely <br /> with the volume of traffic through those intersections. No intersection has averaged as much <br /> as one accident per month over the 1985-87 period, however, and this seems an acceptable <br /> accident rate given the high traffic volumes at some of these intersections. This does not <br /> mean, however, that road improvements are not warranted at some locations because of <br /> safety concerns. <br /> 40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.