My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PL PACKET 05162000
StAnthony
>
Parks & Planning Commission
>
Planning Commission Packets
>
2000
>
PL PACKET 05162000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2015 7:36:38 PM
Creation date
12/30/2015 7:36:22 PM
Metadata
Fields
SP Box #
27
SP Folder Name
PL PACKETS 2000-2004
SP Name
PL PACKET 05162000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br /> City Council Regular Meeting Minutes <br /> April 25, 2000 <br /> Page 2 <br /> 1 Abstention by Thuesen having not been present at the April 11 2000 Meeting. <br /> 2 The motion carried. <br /> 3 VII. PUBLIC HEARINGS. <br /> 4 A. Hearing for Public Input on 2001 Cily Budget. <br /> 5 Mayor Cavanaugh opened the Public Hearing at 7:05 p.m. By way of background, Cavanaugh <br /> 6 explained that the Council is requesting input from the public regarding ideas and suggestions <br /> 7 that the residents would like to see occur in the City and incorporated into the budget. <br /> 8 Traditionally,the Public Hearing for the budget is set for later in the calendar year and it is <br />. 9 difficult sometimes to enact suggestions at that time. The Hearing is held earlier in the year this <br /> 10 time to enable residents to express opinions for potential inclusion into the City's budget. <br /> 11 After calling for input from the members of the audience and hearing none, Mayor Cavanaugh <br /> 12 closed the Public Hearing at 7:06 p.m. <br /> 13 VIII. GENERAL POLICY BUSINESS OF THE COUNCIL. <br /> 14 A. Resolution 00-0.31, re: Award Construction Bid for 33rd Avenue NE Street Improvement <br /> �15 Project. <br /> 16 City Manager Michael Morrison stated that Michael Foertsch of SEH/RCM was in attendance to <br /> 17 review the recent bid tabulation for the project at 33rd Avenue, Silver Lake Road to Stinson. <br /> 18 Mr. Foertsch approached the Council and stated that bids had been solicited and opened on April <br /> 19 14 in connection with the 33rd Avenue Street Improvement Project. <br /> 20 In this respect, Mr. Foertsch directed the Council's attention to a letter dated April 18, 2000 from <br /> 21 SEH/RCM in which the recent bid tabulation was set forth. In essence,three bids were consid- <br /> 22 ered, and"Tenson Construction, Inc."had presented the lowest bid($623,707.00). The engi- <br /> 23 neer's original estimate for the construction portion of the project was $590,969.00. <br /> 24 In response to.a question posed by Cavanaugh regarding funding sources, Morrison directed the <br /> 25 Council's attention to page 26 of the Agenda packet, which was a memorandum from Finance <br /> 26 Director Roger Larson dated April 19,2000 regarding funding for the project. In short,Mr. Lar- <br /> 27 son's memorandum stated that he was confident that the MSA funds available are adequate to <br /> 28 fund and support the four projects anticipated. Those projects are: (1) Silver Lake Bridge Proj- <br /> 29 ect; (2) Signal Light(37th and Highcrest); (3)29th Avenue Street Project(MSA Bond); and(4) <br /> 30 33rd Avenue Project(which would also include an internal loan). <br /> •31 Thuesen expressed concern that the City would be utilizing all of the MSA funds available for <br /> 32 current projects; leaving little or zero funds available for future projects. Morrison replied that <br /> 33 over the past five years,the City has updated many or most of the MSA roads, and even though <br /> 34 other projects will be considered for the future,there should not be a conflict for the use of funds. <br />
The URL can be used to link to this page
Your browser does not support the video tag.