Laserfiche WebLink
Transportation <br /> Although well served by arterial roads with convenient connections of less than six miles to 1-694 and I- <br /> ■ 35W,the study area does not enjoy any direct access to the interstate highway system. <br /> Street Pattern <br /> Road Classification Jurisdiction — ---- T Average Daily <br /> Traffic Counts <br /> j Silver Lake Rd A-minor arterial,divided i Ramsey County 16,500(1998) <br /> Lroute <br /> ■ ! There are three entrances to Apache Plaza and Cub grocery sites,one of which is <br /> j signalized.Signalized intersections contains a right turn lane and a protected left turn j <br /> ■ into the site.Unsignalized accesses have left and right turn lanes.All three accesses <br /> provide free right turns for exiting traffic and merge lanes. There is a single entrance to <br /> ■ I Salvation Army site,southbound right turn only. <br /> 371"Ave NE I A-minor arterial i Hennepin and Ramsey Counties i 10,000(1994) <br /> (County Rd D) (1998) <br /> ■ i I No direct access to project area. <br /> I <br /> County Rd E B minor arterial _ __Ramsey County 1 4,700�1998� <br /> -- ---- <br /> Two entrances to Salvation Army site,left and right turn unprotected turns. <br /> Stinson Blvd. j collector-,four lane__—�City _ — i 9,000(1994) <br /> i Two entrance to Apache Plaza site,one signalized.Access to office and commercial <br /> i properties. <br /> Silver Lane j collector C __ _ 2,400(1994 <br /> _f Access to residential properties bordermg lake and mall. <br /> • 11 <br /> � e e <br /> y, <br /> '3 <br /> ■ <br /> 11 <br /> ■ <br /> +� ' Traffic counts and classifications <br /> Northwest Quadrant Redevelopment Plan St. Anthony Village Page A.7 <br />